Specification |
After-sales Service: 1 Year;
Connection Form: Welded Connection;
Feature: Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable;
Install: Online Guidance;
Material: Steel;
Production: 50000tons/Year;
Delivery Time: 15-45 Days;
Customization: Customized Logo: Min. Order: 5000;
MOQ: 10 Tons;
Size/Dimensions: (Scale) Large;
File Formats: Solid Works, PRO, Autocad(Dxf, Dwg), Pdf, Ti;
Steel Grade: S355/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Section Shape: Round/Rectangle;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automob;
Inspection: with Chemical Composition and Mechanical Propertie;
Quality: En10204 3.1 or 3.2 Certified;
C/O: Form E, Form R, Form F Green Certificate;
|
Connection Form: Bolt Connection;
Feature: Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable;
Install: Support Installation;
Main Structure: Hot Rolled H Beam or Welding H Beam;
Surface Treatment: Painting or Hot DIP Galvanized;
|
After-sales Service: 1 Year;
Connection Form: Welded Connection;
Feature: Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable;
Install: Online Guidance;
Durability: Durable;
Delivery Time: 15-45 Days;
OEM/ODM: OEM ODM CNC Machining Service;
Packaging and Delivery: Transport Package: Pallet and Wooden Case;
MOQ: 100PCS;
Size/Dimensions: Customized;
File Formats: Solid Works,PRO/Engineer, Autocad(Dxf,Dwg), Pdf,Ti;
Available Process Material: Carbon Steel , Stainless , Aluminum, Brass , Coppe;
Finish Treatment Available: Polish , Zinc , Hard Anodizing , Nickel Plating ,;
Heat Treatment Available: Annealing, Quenching Hardening, Blacking,Tempering;
|
Connection Form: Welded Connection;
Feature: Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable;
Install: Support Installation;
Delivery Time: 15-45 Days;
Sample Time: 7 Days If Standard Parts We Have;
OEM/ODM: OEM ODM CNC Machining Service;
MOQ: 100 Pieces;
|
Connection Form: Welded Connection;
Feature: Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable;
Install: Support Installation;
Delivery Time: 15-45 Days;
Sample Time: 7 Days If Standard Parts We Have;
OEM/ODM: OEM ODM CNC Machining Service;
MOQ: 100 Pieces;
|