Specification |
Type: Copper Bars;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Copper Bar;
Shape: Rod;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Cu (Min): 99%;
Price Term: Fob CIF;
MOQ: 1 Kg;
Payment Term: L/C T/T (30%Deposit);
Length: 1500;
|
Type: Brass Bar;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Round;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Length: Less Than 8100mm;
Surface: Mill,Polished,Brushed,etc;
Manufacturing Process: Hot Rolled,Cold Rolled,Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Payment Term: T/T,D/P,L/C,etc;
Technology: Drawn,Extruded;
Trade Terms: Fob, EXW, CIF, CFR, etc;
MOQ: 5PC for Stock, 2 Tons for Order;
|
Type: Copper Sheets;
Application: Electrical Equipment ,Slip Steamed Building,Chemic;
Material: Red Copper;
Shape: Plate;
Alloy: Alloy;
Color: Red;
Standard: ASTM;
Width: 10mm~2500mm;
Keyword: Copper Hot Plate;
Length: Customize;
Thickness: 0.3mm~100mm or Customize;
Packing: Standard Export Packing-for Coppr Sheet;
Delivery Time: 8--14days;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Feature: High Tensile Strength;
|
Type: Copper Sheets;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Plate;
Alloy: Non-alloy;
Color: Purple;
Standard: ASTM;
Thickness: 0.1mm~200mm or Required;
Cu (Min): 99.9%;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Tolerance: 1%,2%,3%,Customize;
Special Application: Ships, Refrigerators, Molds, Aerospace Equipment;
Surface Technical: Corrugated/Perforated/Embossed/Water Ripple/Eched;
Model No.1: Tp1 Tp2 T2 Tu2 Tu1 C2800;
Temper: O-H112; T3-T8; T351-T851;
MOQ: 1 Ton;
|
Type: Brass Bar;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Brass;
Shape: Round;
Alloy: Alloy;
Color: Yellow;
Standard: ASTM,DIN,En,GB,JIS;
Grade: H62,H63,H65,Hpb59-1;
Length: Less Than 8100mm;
Surface: Mill,Polished,Brushed,etc;
Manufacturing Process: Hot Rolled,Cold Rolled,Forged;
Lead Time: 3-5 Days for Stock, 30 Days for Customization;
Payment Term: T/T,D/P,L/C,etc;
Technology: Drawn,Extruded;
Trade Terms: Fob, EXW, CIF, CFR, etc;
MOQ: 5PC for Stock, 2 Tons for Order;
|