Specification |
Type: Stainless Steel Coils;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Square;
Technique: Hot Rolled;
Surface Treatment: Polished;
Keyword: Stainless Steel Plate Sheet Coil;
MOQ: 1 Ton;
Technology: Cold Rolled.Hot Rolled;
Sample: Sample Freely;
Payment Term: L/C T/T (30% Deposit);
Price Term: CIF CFR Fob Ex-Work;
Coil Weight: 3-10tons;
Quality: Party Inspection;
Product Name: Stainless Steel Coil/Sheet/Plate;
Length: as Required;
Width: 3mm-2000mm or as Required;
Thickness: 0.1mm-300mm or as Required;
Surface: 2b or According to Customer Requirement;
Thickness Tolerance: 0.01mm;
Material: 301,302,303,304,304L,304h,310S,316,316L;
|
Type: Stainless Steel Bars;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 200 300 400seires;
Shape: Round;
Technique: Cold Rolled / Hot Rolled;
Surface Treatment: Polished;
Payment Term: Fob CIF CFR EXW;
Length: 3000mm, 4000mm, 5800mm, 6000mm, or as Require;
MOQ: 1 Ton;
Is It in Stock: Stock;
|
Type: Stainless Steel Bars;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 200 300 400 Seires;
Shape: Round;
Technique: Cold Rolled / Hot Rolled;
Surface Treatment: Bright/Polished;
Payment Term: Fob CIF CFR EXW;
Length: 1000mm, 1500mm, 2000mm, 2438mm;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting;
MOQ: 1 Ton;
Delivery Time: 5-7 Working Days;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 304 316L 310S 309S;
Shape: Round;
Technique: Welded;
Surface Treatment: Bright;
Surface: 2b, Ba, a&P, Others Polished Finish;
Length: 1-12m or Customized;
Shipping: CFR CIF Fob CNF;
Production: 40000 Tons/ Month;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Cold Rolled / Hot Rolled;
Surface Treatment: Polished;
Cold Rolled Thickness: 0.15mm-6mm, as Customer Primers Request;
Hot Rolled Thickness: 3.0mm-180mm, as Customer Primers Request;
Surface: Mirror/Hl Brushed/6K/8K/10K/Sand Blast;
Classification: Seamless, Welded;
Production: 40000 Tons/ Month;
Shipping: CFR CIF Fob CNF;
MOQ: 1 Ton;
Delivery Time: 5-7 Working Days;
|