Specification |
Type: Stainless Steel Coils;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Coil;
Technique: Cold Rolled;
Surface Treatment: Polished;
Product Name: Stainless Steel Coils;
Material: 430 410 420 SUS304 304L 202 321 316 316L 201 304;
Surface Technology: 2b, N0.4, Hl, Ba, 8K, Etched, Brushed etc.;
Tolerance: ±1%;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting;
Price Term: CIF CFR Fob EXW;
MOQ: 1 Ton;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 200 Series, 300 Series, 400series;
Shape: Round;
Technique: Hot Rolled, Cold Rolled;
Surface Treatment: Polished;
Processing: Bending, Welding, Decoiling, Punching, Cutting, Mo;
Surface: Ba/2b/No.1/No.3/No.4/8K/Hl/2D/1d;
Tolerance: +/-1%;
MOQ: 1 Ton;
Delivery Time: 15-21 Days;
Invoice: by Theoretical Weight;
|
Type: Stainless Steel Coils;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Cold Rolled;
Surface Treatment: Polished;
Model No.: 304 310S 316L 321 317L 2507 904L 2205 304L 201 316;
Processing Service: Bending, Welding, Punching, Cutting;
Delivery Time: 7-10days;
Price Term: EXW, Fob, CIF, CFR, DDU;
Surface: Ba/2b/No.1/No.3/No.4/8K/Hl/2D/1d;
Payment Term: 30%T/T Advance + 70% Balance;
Material: 200 Series/300 Series/400series;
Tolerance: +/-1%;
Width: 100mm-2500mm or as Required;
Length: 1m-6m or as Request;
Thickness: 0.1-40mm or as Required;
Sample: Offer;
MOQ: 1 Ton;
Stock: Not Stock;
|
Standard: ASTM, AISI, GB, JIS, DIN;
Grade: 2B;
Shape: Flat;
Technique: Cold Rolled;
Surface Treatment: Bright;
Stock: in Stock;
Surface: 2b/No.1/No.4/Hl/8K Mirror;
Leading Time: Within 7-15 Days;
Delivery Terms: Fob/CIF/CFR/CNF/EXW;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 200 Series, 300 Series, 400series;
Shape: Round;
Technique: Hot Rolled, Cold Rolled;
Surface Treatment: Polished;
Processing: Bending, Welding, Decoiling, Punching, Cutting, Mo;
Surface: Ba/2b/No.1/No.3/No.4/8K/Hl/2D/1d;
Tolerance: +/-1%;
MOQ: 1 Ton;
Delivery Time: 15-21 Days;
Invoice: by Theoretical Weight;
|