Specification |
After-sales Service: Yes;
Warranty: 3 Year;
Standard: ASTM, JIS, GB, AISI;
Surface Treatment: Polished;
Technique: Cold or Hot Rolled;
Application: to Make Plate;
Edge: as Customed;
Stock: Stock;
Delivery Time: 3-7 Days;
Thickness: 0.1-50mm;
Width: 600mm-1500mm,Customized;
MOQ: 1 Tons;
|
After-sales Service: Online Service;
Warranty: One Year;
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Galvanized;
Technique: Cold Rolled;
Application: Container Plate;
Edge: Slit edge;
Stock: Stock;
Model No.: SGCC/CGCC/Dx51d+Z, Q235/Q345/SGCC/Dx51d;
Thick: 0.3-2.0mm;
Length: as Customer′s Request;
Zinc Layer: 20g 30g 40g 50g 60g 100g 150g 180g;
Trade Term: EXW Fob CFR CIF;
Delivery: 10-15 Days;
Colour: Ral Color;
Special Use: Wear Resistant Steel;
Width: 665/740/800/900/914/1000/1100mm;
Zinc Coating: G30 G40 G50 G60 G80 G90;
Coated Type: PE SMP HDP PVDF;
Coil Weight: 5-10 Tons;
Mmq: 28 Tons;
Life Span: 15-30 Years, 30+Years;
Price Terms: EXW, Fob, CFR, CIF;
|
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Oiled or Dry;
Technique: Hot Rolled;
Edge: Slit edge;
Stock: Stock;
|
After-sales Service: Online Service;
Warranty: One Year;
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Galvanized;
Technique: Cold Rolled;
Application: Flange Plate;
Edge: Slit edge;
Stock: Stock;
Product Name: Galvanized Steel Strip;
Model No.: Gi;
Material: Dx51d/SGCC;
Width: 20-600mm, or as Request;
Thickness: 0.12-3.0mm;
Coil ID: 160mm/200mm/220mm/508mm;
Coil Weight: 2-5tons;
Usage Industry: Structure/Motorbike and Automobile/Ornamental;
Zinc Coating: 30-275G/M2;
MOQ: 28 Tons;
Delivery Time: 7-15 Days;
Tolerance: 1%;
Zn Coating: 30-400GSM;
Spangle Type: Zero Spangle;
Oiled or Non-Oiled: Non-Oiled;
|
Standard: ASTM, JIS, GB, AISI, BS;
Surface Treatment: Galvanized, Non-Oiled;
Technique: Cold Rolled;
Edge: Slit edge;
Stock: Stock;
Grade: SGCC/Dx51d+Z/CS-B;
Certificate: SNI, Bis, Saso, Soncap, JIS, ISO9001;
Spangle Type: Regular Spangle/Zero Spangle;
Zinc Coating: 20-275G/M2;
Coil ID: 508/610mm;
Delivery Time: 22-30 Days;
MOQ: 25 Mt;
|