Specification |
Type: Stainless Steel Bars;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 200/300/400 Series;
Shape: Bar;
Technique: Cold Drawn/Hot Drawn/Cold Rolled/Hot Rolled;
Surface Treatment: Pickled, Bright, Polished;
Surface: Pickled, Bright, Polished;
Diameter: 8-130mm;
Length: 5.8/6m or Custom;
Stock: in Stock;
Sample: Available;
|
Type: Stainless Steel Sheets;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Flat;
Technique: Hot Rolled;
Surface Treatment: Bright;
Length: Customized;
Width: Customized;
Wall Thickness: Customized;
Delivery Times: 15-21days;
Trade Term: Fob CFR CIF EXW;
Method of Payment: Negotiation;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Cold Rolled;
Surface Treatment: Polished;
Thickness: 1-12 mm,Can Be Cusomized;
Outer Diameter: 20-500mm,Can Be Customized;
Certificate: API, ISO9001,CE,SNI,Bis;
Surface: 2b, Ba, No. 1, No. 4, No. 8, 8K, Mirror, Checkered;
Welding Line Type: ERW, Efw, Spiral Weleded, Seamless;
Payment: L/C, T/T;
Tolerance: 1%;
Delivery Time: Within 7 Days;
MOQ: 5 Tons;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Cold Rolled;
Surface Treatment: Polished;
Thickness: 1-12 mm, Can Be Cusomized;
Outer Diameter: 20-500mm, Can Be Customized;
Certificate: API, ISO9001, CE, SNI, Bis;
Surface: 2b, Ba, No. 1, No. 4, No. 8, 8K, Mirror, Checkered;
Welding Line Type: ERW, Efw, Spiral Weleded, Seamless;
Payment: L/C, T/T;
Tolerance: 1%;
Delivery Time: Within 7 Days;
MOQ: 5 Tons;
|
Type: Stainless Steel Pipes;
Standard: ASTM, AISI, GB, JIS, DIN, EN;
Grade: 300 Series;
Shape: Round;
Technique: Cold Rolled;
Surface Treatment: Polished;
Thickness: 1-12 mm, Can Be Cusomized;
Outer Diameter: 20-500mm, Can Be Customized;
Certificate: API, ISO9001, CE, SNI, Bis;
Surface: 2b, Ba, No. 1, No. 4, No. 8, 8K, Mirror, Checkered;
Welding Line Type: ERW, Efw, Spiral Weleded, Seamless;
Payment: L/C, T/T;
Tolerance: 1%;
Delivery Time: Within 7 Days;
MOQ: 5 Tons;
|