Specification |
Manufacturing Process: Sintered;
Bonding Agent: Metal;
Segment Size: 20*12mm;
Bond: Extreme Hard, Hard, Medium, Soft, Extreme Soft;
Grit: #6, #16, #25, #30, #50, #80, #100, #200, #400 etc;
Application: for Concrete Floor and Terrazzo Grinding;
Packing Inner Box: 9 Pieces or 12 Pieces;
Packing Carton: 108 Pieces;
G.W: 22 Kg for One Carton ( 108 Pieces );
Main Market: Europe, North America, Oceania, Thailand etc;
Lead Times: Quantity < 600 Pieces, 10 Days;
|
Manufacturing Process: Sintered;
Shape: Cylindrical;
Bonding Agent: Metal;
Product Name: CNC Stubbing Wheel;
Material: Metal, Diamond;
Usage: for Sink Hole;
Abrasive Grain Sizes: 30#,40#,60#,100#,120#;
Diameter: 50,86,91,150mm etc.;
Segment Height: 20/25/30/40mm;
Connection: M14.Bt30,Bt40;
Application Machine: CNC Machines;
Color: Customized;
|
Manufacturing Process: Sintered;
Shape: Cylindrical;
Bonding Agent: Metal;
Product Name: CNC Stubbing Wheel;
Material: Metal, Diamond;
Usage: for Sink Hole;
Abrasive Grain Sizes: 30#,40#,60#,100#,120#;
Diameter: 50,86,91,150mm etc.;
Segment Height: 20/25/30/40mm;
Connection: M14.Bt30,Bt40;
Application Machine: CNC Machines;
Color: Customized;
|
Manufacturing Process: Sintered;
Shape: Cup-Shaped;
Bonding Agent: Metal;
Application: Concrete Surface, Hard and Soft Building Material;
Material: Diamond and Metal;
Company: Manufactuer;
Advantage: Fast Grinding, Long Working Life;
Shipping Cost: to Be Negotiated;
Color: Customized;
Diamond Grit and Bond: #30/40 with Medium Bond;
Shipping: by Air, by Sea; by Express;
Equipment: Angle Grinders;
Sample Production Time: 5-7days;
Manufacturing Experience: Over 10 Years;
|
Manufacturing Process: Sintered;
Shape: Cup-Shaped;
Bonding Agent: Metal;
Application: Concrete Surface, Hard and Soft Building Material;
Material: Diamond and Metal;
Company: Manufactuer;
Advantage: Fast Grinding, Long Working Life;
Shipping Cost: to Be Negotiated;
Color: Customized;
Diamond Grit and Bond: #30/40 with Medium Bond;
Shipping: by Air, by Sea; by Express;
Equipment: Angle Grinders;
Sample Production Time: 5-7days;
Manufacturing Experience: Over 10 Years;
|