Specification |
Production Scope: Product Line;
Condition: New;
Automation: Automation;
After-sales Service: Installation and Remote;
Capacity: 100-600MW;
Shift: 24h 3 Shift;
Production: Solar Panel;
Factory Size: 8000m2;
Solar Cell: 156-230mm;
Cell Type: Perc Topcon Hjt IBC Hbc Sunpower;
Half Cut: 1/2 1/3 1/4;
Double Glass: Yes;
Non Destructive Cutting: Yes;
Solar Cell Laser Cut: Yes;
on Line Glass Loading: Yes;
Test: on Line EL and IV Tester;
Laminator: Double Chamber;
Framing: on Line Framing Machine;
Installation: Customer Site Installation;
|
Production Scope: Product Line;
Condition: New;
Automation: Automatic;
After-sales Service: Yes;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|
Production Scope: Product Line;
Condition: New;
Automation: Automatic;
After-sales Service: Yes;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|
Production Scope: Product Line;
Condition: New;
Automation: Automatic;
After-sales Service: Yes;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|
Production Scope: Product Line;
Condition: New;
Automation: Automatic;
After-sales Service: Yes;
Heating Method: Electric, Diesel, Ng, LPG;
Operation Mode: Automatic, Semi Automatic, Manual;
Material of Tank: PP Plate, FRP, Granite;
Material of Kettle: Steel or Ceramic;
Installation: Concluded as Customer Required;
Delivery Term: EXW, Fca, Fob, CIF, DDU, DAP, DDP;
OEM, ODM: Available;
Delivery Time: 4-6 Months;
|