Specification |
Standard: DIN, GB, JIS;
Type: Threaded Connection Flange;
Material: Stainless Steel;
Structure: Flanges;
Connection: Flanged;
Sealing Surface: FF/RF/M/FM/T/G/Rj;
Manufacturing Way: Forging;
MOQ: 1 Ton;
Technique: Forged;
Size: DN10-DN2000;
Packing: Woven Bag, Wooden Box, Wooden Pallet with Plastic;
C.O.: Provide;
|
Standard: ANSI, DIN, GB, JIS, GOST, BSW, Awwa, En, API;
Type: Threaded Connection Flange;
Material: Stainless Steel;
Structure: Flanges;
Connection: Screws;
Sealing Surface: RF;
Manufacturing Way: Forging;
Pressure: Class 150;
Surface Treatment: Oil;
Manufacturing Standard: ANSI B16.5;
Certificates: ISO/PED/CE/EU/API;
Application: for Water, Oil, Gas and Petroleum Industry Service;
Delivery Time: 2-4 Weeks;
Shipping Method: Recommend Sea Shipping;
|
Standard: ANSI, DIN, GB, JIS, GOST, BSW, Awwa, En, API;
Type: Threaded Connection Flange;
Material: Carbon Steel;
Structure: Flanges;
Connection: Screws;
Sealing Surface: RF;
Manufacturing Way: Forging;
Pressure: Class 150;
Surface Treatment: Black Coating;
Manufacturing Standard: ANSI B16.5;
Certificates: ISO/PED/CE/EU/API;
Application: for Water, Oil, Gas and Petroleum Industry Service;
Delivery Time: 2-4 Weeks;
Shipping Method: Recommend Sea Shipping;
|
Standard: ANSI, DIN, GB, JIS, GOST;
Type: Welding Flange;
Material: Carbon Steel;
Structure: Flanges;
Connection: Flanged;
Sealing Surface: RF;
Manufacturing Way: Forging;
Size: 1/2" to 48";
Pressure Class: 150-2500, 5K-30K Pn0.6- 4.0MPa;
Delivery Time: 20-35 Days Ex Mill;
Loading Port: Chinese Main Port;
Sample: Can Be Provided;
Testing Way: The Third Party Test;
MOQ: 10 PCS;
Shipment Terms: Fob, CFR,CIF CPT CIP EXW;
Flange Type: Plate, Slip on, Welded Neck, Threaded;
|
Standard: ANSI, DIN, GB, JIS, GOST, BSW, Awwa, En, API;
Type: Threaded Connection Flange;
Material: Stainless Steel;
Structure: Flanges;
Connection: Screws;
Sealing Surface: RF;
Manufacturing Way: Forging;
Pressure: Class 150;
Surface Treatment: Oil;
Manufacturing Standard: ANSI B16.5;
Certificates: ISO/PED/CE/EU/API;
Application: for Water, Oil, Gas and Petroleum Industry Service;
Delivery Time: 2-4 Weeks;
Shipping Method: Recommend Sea Shipping;
|