Steel Construction Projects
US$900.00-1,500.00 / Ton

Bailey Type Pontoon Floating Bridge for Emergency and Temporary Traffic Needs Video

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-99 Tons US$1,500.00

100-999 Tons US$1,200.00

1,000-4,999 Tons US$1,000.00

5,000-9,999 Tons US$950.00

10,000+ Tons US$900.00

Sepcifications

  • After-sales Service Guidance and Installation Services
  • Warranty 3 Years
  • Certification DIN, JIS, GB, BS, ASTM, AISI
  • Life Temporary Bridge
  • Across Way Fixed Bridge
  • Lane Position Deck Bridge
  • Usage Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge
  • Scale Middle Bridge
  • Stress Characteristics Truss Bridge
  • Material Steel Bridge
  • Transport Package Transported by Container/Truck in Strong Packing
  • Specification Customizable
  • Trademark GreatWall
  • Origin Zhenjiang
  • Steel Grade S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460
  • Loading Capacity Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24
  • Application Pedestrian, Road
  • Hot DIP Galvanized ISO1461/AS/NZS 4680/ASTM-A123/BS1706 or Equivalent
  • Painting Long-Term Epoxy Zinc-Rich Kit or Temporary Alkyd

Product Description

Product Description Bailey Pontoon Floating Bridge refers to a bridge that floats on the water surface with a boat or pontoon tank instead of bridge piers. Its structure is not complex, it is open and convenient. The characteristics of bridge construction is simple and fast, but high ...

Learn More

Steel Construction Projects Comparison
Transaction Info
Price US $ 900.00-1,500.00/ Ton US $ 300.00-310.00/ Piece US $ 300.00-310.00/ Piece US $ 300.00-310.00/ Ton US $ 300.00-310.00/ Ton
Min Order 1 Tons 1 Piece 1 Piece 1 Tons 1 Tons
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P L/C, T/T, D/P
Quality Control
Product Certification DIN, JIS, GB, BS, ASTM, AISI GB, ASTM GB, ASTM GB, ASTM GB, ASTM
Management System Certification ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, HSE, QHSE ISO 9001 ISO 9001 ISO 9001, ISO 14001 ISO 9001, ISO 14001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe - - North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Eastern Asia
Annual Export Revenue US$10 Million - US$50 Million - - US$10 Million - US$50 Million US$10 Million - US$50 Million
Business Model OEM, ODM, Own Brand(EVERCROSS) - - OEM, ODM OEM, ODM
Average Lead Time Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
- - Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 1-3 months
Product Attributes
Specification
After-sales Service: Guidance and Installation Services;
Warranty: 3 Years;
Life: Temporary Bridge;
Across Way: Fixed Bridge;
Lane Position: Deck Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Truss Bridge;
Material: Steel Bridge;
Steel Grade: S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Loading Capacity: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Application: Pedestrian, Road;
Hot DIP Galvanized: ISO1461/AS/NZS 4680/ASTM-A123/BS1706 or Equivalent;
Painting: Long-Term Epoxy Zinc-Rich Kit or Temporary Alkyd;
After-sales Service: Installation Instructions;
Warranty: Life Time;
Life: Semi-Permanent Bridge;
Across Way: Diffuse Water Bridge;
Lane Position: Half Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Beam Bridge;
Material: Steel Bridge;
Payment: L/C, T/T, Escrow;
MOQ: 1 PC;
Delivery Detail: According to The Order;
Supply Ability: 10000 Ton/Tons Per Year;
Packing: 40' Standard Hq Containers;
After-sales Service: Installation Instructions;
Warranty: Life Time;
Life: Semi-Permanent Bridge;
Across Way: Diffuse Water Bridge;
Lane Position: Half Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Beam Bridge;
Material: Steel Bridge;
Payment: L/C, T/T, Escrow;
MOQ: 1 PC;
Delivery Detail: According to The Order;
Supply Ability: 10000 Ton/Tons Per Year;
Packing: 40' Standard Hq Containers;
After-sales Service: Installation Instructions;
Warranty: 6 Months;
Life: Semi-Permanent Bridge;
Across Way: Diffuse Water Bridge;
Lane Position: Half Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Beam Bridge;
Material: Steel Bridge;
Product Capability: 60000 Pieces Per Year;
Standard: ASTM,GB,BS,BV;
Packing: Packing in Containers or Bulk;
OEM: Specialized;
After-sales Service: Installation Instructions;
Warranty: 6 Months;
Life: Semi-Permanent Bridge;
Across Way: Diffuse Water Bridge;
Lane Position: Half Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Beam Bridge;
Material: Steel Bridge;
Product Capability: 60000 Pieces Per Year;
Standard: ASTM,GB,BS,BV;
Packing: Packing in Containers or Bulk;
OEM: Specialized;
Supplier Name

Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.

Diamond Member Audited Supplier

Jiangsu Bailey Steel Bridge Co., Ltd.

Diamond Member Audited Supplier

Jiangsu Bailey Steel Bridge Co., Ltd.

Diamond Member Audited Supplier

Jiangsu Zhonghai Bridge Equipment Co.,Ltd.

Diamond Member Audited Supplier

Jiangsu Zhonghai Bridge Equipment Co.,Ltd.

Diamond Member Audited Supplier