Metal Framework
US$25.00-60.00 / Square Meter
View

Pre Engineered Steel Structure Framework Factory Shed Workshop Video

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

500-999 Square Meters US$60.00

1,000-2,999 Square Meters US$40.00

3,000+ Square Meters US$25.00

Sepcifications

  • Usage Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Shed, Hangar, Prefab House, Poultry House, etc
  • Transport Package Steel Pallet
  • Specification Steel grade Q345B& Q235
  • Trademark XGZ
  • Origin Qingdao, China
  • Company Nature Public Company
  • Delivery Time Normally 30-45 Days After Shop Drawing Approved
  • Payment Term T/T, L/C
  • Surface Treatment of Steel Structure Painted or Galvanized
  • Software CAD, Tekla, Sketchup, Pkpm, Bim
  • Staffs 1000+
  • Workshop 6
  • Engineer 100+
  • Connection Welded or Bolted Connection
  • Roof and Wall Sheet Single Sheet or Insulated Sandwich Panel
  • Insulated Sandwich Panel EPS, Fiberglass, Rockwool, PU
  • Single Steel Sheet Galvanized Sheet, Alu-Zinc Sheet
  • Steel Structure Portal Frame, Truss Structure
  • Door & Window Sliding Door, Rolled Shutter Door
  • Ventilation Turbine Ventilator, Ridge Monitor
  • Material Steel Structure
  • Certification ISO, CE, SGS, BV
  • Customized Customized
  • After-sales Service Yes
  • Warranty Yes

Product Description

Product Description Characteristics Of Pre Engineered Steel Structure Framework Factory Shed Workshop : 1. Environmental friendly 2. Lower cost 3. Service life more than 50 years 4. Stable and earthquake resistance up to 9 grade 5. Fast construction, time saving and labor saving 6. ...

Learn More

Metal Framework Comparison
Transaction Info
Price US $ 25.00-60.00/ Square Meter Negotiable Negotiable US $ 55/ Square Meter US $ 30.00-90.00/ Square Meter
Min Order 500 Square Meters 1000 Square Meters 1000 Square Meters 1000 Square Meters 1000 Square Meters
Trade Terms - FOB, CFR, CIF FOB, CFR, CIF FOB, CFR, CIF, CIP, CPT, EXW FOB, CFR, CIF, CIP, CPT, EXW
Payment Terms L/C, T/T, Western Union L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification ISO, CE, SGS, BV ISO, CE ISO, CE ISO, CE ISO, CE
Management System Certification ISO 9001, ISO 14000 ISO 9001, ISO 9000 ISO 9001, ISO 9000 ISO 9001, ISO 9000 ISO 9001, ISO 9000
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Domestic Domestic Domestic Domestic
Annual Export Revenue - - - - -
Business Model OEM OEM OEM OEM OEM
Average Lead Time Peak-season: 1-3 Month(s) Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop, Shed, Hangar, Prefab House, Poultry House, etc;
Company Nature: Public Company;
Delivery Time: Normally 30-45 Days After Shop Drawing Approved;
Payment Term: T/T, L/C;
Surface Treatment of Steel Structure: Painted or Galvanized;
Software: CAD, Tekla, Sketchup, Pkpm, Bim;
Staffs: 1000+;
Workshop: 6;
Engineer: 100+;
Connection: Welded or Bolted Connection;
Roof and Wall Sheet: Single Sheet or Insulated Sandwich Panel;
Insulated Sandwich Panel: EPS, Fiberglass, Rockwool, PU;
Single Steel Sheet: Galvanized Sheet, Alu-Zinc Sheet;
Steel Structure: Portal Frame, Truss Structure;
Door & Window: Sliding Door, Rolled Shutter Door;
Ventilation: Turbine Ventilator, Ridge Monitor;
Material: Steel Structure;
Customized: Customized;
After-sales Service: Yes;
Warranty: Yes;
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop;
Brand Name: Tailong Construction;
Purlin: C-Section and Z-Section;
Roof and Wall Panel: EPS, PU, Rock Wool Sandwich Panel;
Column and Beam: Welded H-Section and Hot Rolled I-Section;
Window: PVC or Aluminum Alloy;
Door: Sliding or Rolling Door;
Packaging Details: in Bulk or as Customer's Request;
Delivery Detail: 15-30 Days After Receiving Deposit;
Material: Steel Structure;
Customized: Customized;
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop;
Brand Name: Tailong Construction;
Purlin: C-Section and Z-Section;
Roof and Wall Panel: EPS, PU, Rock Wool Sandwich Panel;
Column and Beam: Welded H-Section and Hot Rolled I-Section;
Window: PVC or Aluminum Alloy;
Door: Sliding or Rolling Door;
Packaging Details: in Bulk or as Customer's Request;
Delivery Detail: 15-30 Days After Receiving Deposit;
Material: Steel Structure;
Customized: Customized;
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop;
Materials: Q235B &Q345b Steel;
Purlin: C Type or Z Type;
Window: Aluminium Window or Model Steel Push-Pull Window;
Door: Slidding Door or Rplling Door;
Steel Column: H-Beam;
Surface Treatment: Two Layer of Anti-Rust Paniting;
Material: Steel Structure;
Customized: Customized;
Usage: Warehouse, Villa, Dormitories, Temporary Offices, Workshop;
Materials: Steel;
Supplier Name

Qingdao Xinguangzheng Sino Building Co., Ltd

China Supplier - Diamond Member Audited Supplier

Qingdao Tailong Steel Structure Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Qingdao Tailong Steel Structure Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Qingdao Tailong Steel Structure Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Qingdao Tailong Steel Structure Co., Ltd.

China Supplier - Diamond Member Audited Supplier