Specification |
After-sales Service: Long Service Life;
Warranty: One Year;
Type: Extruder;
Product Type: Granulating Extruder;
Feeding Mode: Multiple Feed;
Assembly Structure: Integral Type Extruder;
Screw: Twin-Screw;
Engagement System: Full Intermeshing;
Screw Channel Structure: Deep Screw;
Exhaust: Exhaust;
Automation: Automatic;
Computerized: Computerized;
Output (Kg/H): 2500-3500kg/H;
Weight: Around 13000kg;
Power (Kw): 315;
Screw Speed (Rpm): 900 Rpm;
Screw Diameter (mm): 52;
Screw L/D Ratio: 20-68;
|
Type: Pipe Extruder;
Plastic Processed: Pert, HDPE,PU,PPR,PVC;
Product Type: Extrusion Molding Machine;
Feeding Mode: One Feed;
Assembly Structure: Integral Type Extruder;
Screw: Single-Screw;
Engagement System: Full Intermeshing;
Screw Channel Structure: Deep Screw;
Exhaust: Don't Exhaust;
Automation: Automatic;
Computerized: Computerized;
Pert II Insulation Pipe Structures: Three Layers;
Pert II Pipe Diameters: From 30mm to 160mm;
Pre-Insulation Pipa Applications: Air-Conditioning Piping System, Hot Spring Pipies;
HDPE Jacket: out Layer;
HDPE Jacket Pipe Machine: Vacuum Calibration Method Forming, Reliable Qualit;
Polyurethane Foaming Machine: High Precision, Self-Cleaning;
Payment Terms: 30% Prepayment, 70% Balance Before Shipment;
Main Elementes: Siemens, ABB, Omron, Shneider, Rkc, Teco;
Production Period: 40-60 Working Days;
Warranty Period: 18 Months;
|
Type: Pipe Extruder;
Plastic Processed: Pert, HDPE,PU,PPR,PVC;
Product Type: Extrusion Molding Machine;
Feeding Mode: One Feed;
Assembly Structure: Integral Type Extruder;
Screw: Single-Screw;
Engagement System: Full Intermeshing;
Screw Channel Structure: Deep Screw;
Exhaust: Don't Exhaust;
Automation: Automatic;
Computerized: Computerized;
Pert II Insulation Pipe Structures: Three Layers;
Pert II Pipe Diameters: From 30mm to 160mm;
Pre-Insulation Pipa Applications: Air-Conditioning Piping System, Hot Spring Pipies;
HDPE Jacket: out Layer;
HDPE Jacket Pipe Machine: Vacuum Calibration Method Forming, Reliable Qualit;
Polyurethane Foaming Machine: High Precision, Self-Cleaning;
Payment Terms: 30% Prepayment, 70% Balance Before Shipment;
Main Elementes: Siemens, ABB, Omron, Shneider, Rkc, Teco;
Production Period: 40-60 Working Days;
Warranty Period: 18 Months;
|
Type: Pipe Extruder;
Plastic Processed: Pert, HDPE,PU,PPR,PVC;
Product Type: Extrusion Molding Machine;
Feeding Mode: One Feed;
Assembly Structure: Integral Type Extruder;
Screw: Single-Screw;
Engagement System: Full Intermeshing;
Screw Channel Structure: Deep Screw;
Exhaust: Don't Exhaust;
Automation: Automatic;
Computerized: Computerized;
Pert II Insulation Pipe Structures: Three Layers;
Pert II Pipe Diameters: From 30mm to 160mm;
Pre-Insulation Pipa Applications: Air-Conditioning Piping System, Hot Spring Pipies;
HDPE Jacket: out Layer;
HDPE Jacket Pipe Machine: Vacuum Calibration Method Forming, Reliable Qualit;
Polyurethane Foaming Machine: High Precision, Self-Cleaning;
Payment Terms: 30% Prepayment, 70% Balance Before Shipment;
Main Elementes: Siemens, ABB, Omron, Shneider, Rkc, Teco;
Production Period: 40-60 Working Days;
Warranty Period: 18 Months;
|
Type: Pipe Extruder;
Plastic Processed: Pert, HDPE,PU,PPR,PVC;
Product Type: Extrusion Molding Machine;
Feeding Mode: One Feed;
Assembly Structure: Integral Type Extruder;
Screw: Single-Screw;
Engagement System: Full Intermeshing;
Screw Channel Structure: Deep Screw;
Exhaust: Don't Exhaust;
Automation: Automatic;
Computerized: Computerized;
Pert II Insulation Pipe Structures: Three Layers;
Pert II Pipe Diameters: From 30mm to 160mm;
Pre-Insulation Pipa Applications: Air-Conditioning Piping System, Hot Spring Pipies;
HDPE Jacket: out Layer;
HDPE Jacket Pipe Machine: Vacuum Calibration Method Forming, Reliable Qualit;
Polyurethane Foaming Machine: High Precision, Self-Cleaning;
Payment Terms: 30% Prepayment, 70% Balance Before Shipment;
Main Elementes: Siemens, ABB, Omron, Shneider, Rkc, Teco;
Production Period: 40-60 Working Days;
Warranty Period: 18 Months;
|