Intelligent Vibrating Bowl Feeder System

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$500.00-1,000.00 / Piece

Sepcifications

  • Transport Package Wooden Boxes
  • Specification 400#/Stainless steel material
  • Trademark Ming Xin intelligence
  • Origin Guangdong, China

Product Description

Vibration Bowl by Dongguan Ming Xin Intelligent Equipment Co., Ltd. The Vibration Bowl is an advanced automatic sorting and feeding equipment, revolutionizing industrial automation. This product is versatile and suitable for a wide range of industries, providing efficient and precise sorting ...

Learn More

Intelligent Vibrating Bowl Feeder Comparison
Transaction Info
Price US $ 500.00-1,000.00/ Piece US $ 129.00-139.00/ Piece US $ 33.00-200.00/ Piece US $ 129.00-139.00/ Piece US $ 33.00-200.00/ Piece
Min Order 1 Pieces 50 Pieces 30 Pieces 50 Pieces 30 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P T/T T/T T/T T/T
Quality Control
Management System Certification ISO 9001 ISO 9001, ISO 14001 ISO 9001, ISO 14001 ISO 9001, ISO 14001 ISO 9001, ISO 14001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand OEM, Own Brand
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1-3 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Surface Treatment: Hard Chrome, Zinc, Copper;
MOQ: 50PCS;
Operating Temperature: -40 Degree to +120 Degree;
Chrome Plating: Hard Chrome Plated;
Leading Time: 40-50 Working Days After Receiving Signed Drawings;
Paint Color: Customization, Black, Red, Gray, Yellow, Blue;
Stroke Length: 20mm--220mm, Customizable;
Power: Hydraulic;
Quality Check: 100% Testing Before Shipping;
Bore Size: 40mm--320mm, Customizable;
Application: Dock Leveler;
Oil Port: NPT/SAE/BSPP;
Structure: Piston Type;
Material: 20#Steel/45#Steel;
Seals: Packer/Hallite/Gapi;
Warranty: 2 Years Warranty;
Oil Port: NPT/SAE/BSPP;
Acting Type: Double Acting or Single Acting;
Paint Color: Customization, Black, Red, Gray, Yellow, Blue;
Surface Treatment: Hard Chrome, Zinc, Copper;
Chrome Plating: Hard Chrome Plated;
Bore Size: 40mm-320mm, Customizable;
Stroke Length: 20mm-320mm, Customizable;
Application: Environmental Equipments;
Quality Check: 100% Testing Before Shipping;
Lead Time: 40-50 Working Days After Receiving Signed Drawings;
Surface Treatment: Hard Chrome, Zinc, Copper;
MOQ: 50PCS;
Operating Temperature: -40 Degree to +120 Degree;
Chrome Plating: Hard Chrome Plated;
Leading Time: 40-50 Working Days After Receiving Signed Drawings;
Paint Color: Customization, Black, Red, Gray, Yellow, Blue;
Stroke Length: 20mm--220mm, Customizable;
Power: Hydraulic;
Quality Check: 100% Testing Before Shipping;
Bore Size: 40mm--320mm, Customizable;
Application: Dock Leveler;
Oil Port: NPT/SAE/BSPP;
Structure: Piston Type;
Material: 20#Steel/45#Steel;
Seals: Packer/Hallite/Gapi;
Warranty: 2 Years Warranty;
Oil Port: NPT/SAE/BSPP;
Acting Type: Double Acting or Single Acting;
Paint Color: Customization, Black, Red, Gray, Yellow, Blue;
Surface Treatment: Hard Chrome, Zinc, Copper;
Chrome Plating: Hard Chrome Plated;
Bore Size: 40mm-320mm, Customizable;
Stroke Length: 20mm-320mm, Customizable;
Application: Environmental Equipments;
Quality Check: 100% Testing Before Shipping;
Lead Time: 40-50 Working Days After Receiving Signed Drawings;
Supplier Name

Dongguan Ming Xin Intelligent Equipment Co., Ltd.

China Supplier - Gold Member Audited Supplier

Ningbo LD Hydraulic Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Ningbo LD Hydraulic Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Ningbo LD Hydraulic Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Ningbo LD Hydraulic Co., Ltd.

China Supplier - Diamond Member Audited Supplier