Specification |
Material: PP/PC/POM/ABS/PVC/PS/PE Ect;
Application: Medical, Household, Electronics, Automotive, Agricultural, Furniture;
Mold Life: 500000 Sets;
Surface: Color Painting, Texture, Silk-Printing, Vacuum COA;
Mold Material: P20/S50c/H13/Nak80/718/738h/S136;
Characteristic: Anti-Dust and Impact Resistance;
Particularity: Waterproof and High Temperature Resistant;
Application Industry: Medical, Household, Electronics, Automotive, Agric;
|
Material: ABS;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Model No.: Deli-P001;
Product Name: Custom Injection Molding Parts;
Mould Material: S136h, 718h, Nak80, P20, H13, etc.;
Production Material: ABS, PP, PC, POM, PVC, PMMA, Nylon, PA 12;
Surface Treatment: Matte, Common Polishing, Mirror Polishing, Texture;
Drawing Format: .STP / .Step / .Igs /.Stl /.Dwg / .Pdf;
Runner System: Hot Runner and Cold Runner;
Product Color: Pantone/Ral and Other Custom Colors;
Product Size: According to Customers′ Drawings or Samples;
Design Service: According to The Customer Requirement;
Sample: Available. One Cavity Sample Mold or 3D Printing.;
MOQ: 1000PCS;
Delivery Date: 20-30days;
Certificate: IATF 16949:2016 / ISO 9001:2015 / ISO 45001:2018;
Function: Electronics/Auto Parts/Industrial Parts /Daily Su;
|
Material: Nylon, POM, ABS, PU, PP, PE, PTFE, UHMWPE, HDPE;
Application: Medical, Household, Electronics, Automotive;
Material Selection: Buyer Customization;
|
Material: ABS, PP, PS, POM, PE, PC, Nylon, TPE, PA66;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Item: Plastic Injection Molding Parts;
Processing: Injection Mould;
Sample: 3D Rapid Prototype Available;
Injection Equipment: 90-1100t;
Mold Leading Time: 30-35 Days;
|
Material: ABS, PP, PS, POM, PE, PC, Nylon, TPE, PA66;
Application: Medical, Household, Electronics, Automotive, Agricultural;
Item Name: Plastic Injection Moling Products;
Molding Method: Injection Molding;
Surface Treatment: Painting, Chrom Plating;
Equipment Size: 90-1600t;
Mold Leading Time: 30-35 Days;
Production Time: 5-7 Days;
|