Building Material
US$3.00-30.00 / Piece
View
  • Recommend for you
  • What is Hot DIP Galvanized Facade Layher Frame Scaffolding for European Market
  • What is High Quality British Standard Scaffolding Access Safety Swing Door
  • What is 320mm Width Layher All Round Ringlock Steel Deck Scaffolding Steel Plank Layher Scaffolding Plank

What is BS1139 210mm 240mm Gi Plank Scaffolding Steel Board Metal Palnk Steel Plank Walk Board Steel Platform Metal Deck Catwalk Metal Plank with Hook for Construction

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$3.00-30.00 / Piece

Sepcifications

  • Material Steel
  • Type All Rround /Ringlock Scaffolding
  • Framework Combined Scaffolding
  • Move Method Horizontal mobile Scaffolding
  • Scaffolding Part Type Scaffolding Planks
  • Construction Properties Building Scaffold
  • Transport Package Pallet/Bare Package
  • Specification Ringlock System
  • Trademark Total Contec
  • Origin China
  • Certificate ISO/SGS/CE/ANSI/as Nzs
  • Raw Material Steel Q235~Q195
  • Surface Finish Hot DIP Galvanized/Pre Galvanzied
  • Thickness 1mm-2mm
  • OEM/ODM Available

Product Description

FAQ: 1. Are you trading company or manufacture? We have two factories in Jiangsu and Heibei Province 2. How about the delivery time? 10-15 days after receiving the deposit (1*40FT) We can sent out products within 2 days if we have stock 3. What's your production capacity? ...

Learn More

Building Material Comparison
Transaction Info
Price US $ 3.00-30.00/ Piece US $ 5.00-25.00/ Piece US $ 1,050.00-1,100.00/ Ton US $ 5.00-25.00/ Piece US $ 5.00-25.00/ Piece
Min Order 100 Pieces 1000 Pieces 20 Tons 1000 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal
Quality Control
Product Certification ISO/SGS/CE/ANSI/as Nzs - - - -
Management System Certification ISO 9001 - - - -
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Material: Steel;
Type: All Rround /Ringlock Scaffolding;
Framework: Combined Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Raw Material: Steel Q235~Q195;
Surface Finish: Hot DIP Galvanized/Pre Galvanzied;
Thickness: 1mm-2mm;
OEM/ODM: Available;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Surface: Pre Galvanfized and Hot Galvanized;
Steel Grade: Q195/Q235;
MOQ: 20ttons;
Delivery Time: 20days;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Surface: Pre Galvanfized and Hot Galvanized;
Steel Grade: Q195/Q235;
MOQ: 20ttons;
Delivery Time: 20days;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Surface: Pre Galvanfized and Hot Galvanized;
Steel Grade: Q195/Q235;
MOQ: 20ttons;
Delivery Time: 20days;
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Steel;
Type: Mobile;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Double Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Planks;
Construction Properties: Building Scaffold;
Surface: Pre Galvanfized and Hot Galvanized;
Steel Grade: Q195/Q235;
MOQ: 20ttons;
Delivery Time: 20days;
Supplier Name

WUXI TOTAL CONTEC METAL INDUSTRIES CO.,LTD

China Supplier - Diamond Member Audited Supplier

Nord Technology (Tianjin) Limited Company

China Supplier - Diamond Member Audited Supplier

Nord Technology (Tianjin) Limited Company

China Supplier - Diamond Member Audited Supplier

Nord Technology (Tianjin) Limited Company

China Supplier - Diamond Member Audited Supplier

Nord Technology (Tianjin) Limited Company

China Supplier - Diamond Member Audited Supplier