Specification |
Accessories 1: Power Fitting;
Accessories 2: Tower Foundation;
Accessories 3: Cable and Conductor;
Accessories 4: Insulator;
Accessories 5: Anchor Bolts and Template;
|
Molding Method: Hot-Rolled Steel;
Usage: Steel Structure Construction;
Surface Treatment: Painting or Hot-DIP Galvanized;
Drawing: CAD, Tekla, 3D Model, Pkpm, Bim;
Installation: Engineer Guidance on Site;
Service Life: 50 Years;
Size: Customized;
Keyword: Prefabricated Steel Structure Warehouse/Workshop;
Features: Prefab Steel Structure;
Parapet Wall: as Requested;
Color: Customizable;
Shot Blasting Level: SA 2.5;
Raw Steel Material: Q235B, Q355b, ASTM A36;
Drawing: Design: The Drawing as Your Demand;
Wall Cladding: Corrugated Steel Sheet or Sandwich Panel;
|
Molding Method: Hot-Rolled Steel;
Usage: Steel Structure Construction;
Surface Treatment: Painting or Hot-DIP Galvanized;
Drawing: CAD, Tekla, 3D Model, Pkpm, Bim;
Installation: Engineer Guidance on Site;
Service Life: 50 Years;
Size: Customized;
Keyword: Prefabricated Steel Structure Warehouse/Workshop;
Features: Prefab Steel Structure;
Parapet Wall: as Requested;
Color: Customizable;
Shot Blasting Level: SA 2.5;
Raw Steel Material: Q235B, Q355b, ASTM A36;
Drawing: Design: The Drawing as Your Demand;
Wall Cladding: Corrugated Steel Sheet or Sandwich Panel;
|
After-sales Service: 10 Years+;
Molding Method: Aluminum Alloy Frame;
Usage: Industry, Outdoor;
Keyword: Aluminium Alloy Shed;
Function: Strong UV-Resistant; Fire-Retardant; Waterproof;
Fabric: Polyester /PC Endurance Board;
Packaging Details: Roofing Will Be Packed in Paper Box;
Supply Ability: 60000 Square Meter/Square Meters Per Month;
Application: Home Parking/Private Parking;
After Sale: Video Guide or Live Guide;
Color: Black White Red Green;
Warranty Period: Ten - Fifteen Years;
Temprature: -40--+80 Degreen;
Structure: 2.5m Aluminium Alloy Frame;
Rolled Steel: All Tube Aluminum;
HS: 2204293781;
Technical Requirements: 3D3s;
Fire Rating: B1d Standard;
|
Molding Method: Hot Rolled or Weld;
Drawing: Free Design Drawing, 2D& 3D Version;
Wind,Snow,Earthquake Resistance: 80~280km/H, 30~200kg/M2, Grade 9;
Frame: Steel Portal Frame Building;
Delivery Time: 4~6 Weeks;
Certificate: ISO, CE, Third Party Inspect;
Roof Pitch: 10%, 12%, 16%, 25%, 30%etc;
Bay: 5m, 6m, 7, 9m etc;
Column & Rafter: Hot Rolled H Beam or I Beam;
Tie Beam: Round Pipe or Square Tube;
Purlin: C Purlin, Z Purlin, Hot Rolled H Beam Purlin;
Roof Coverage: Single Corrugated Sheet or Sandwich Panel;
Wall Coverage: Single Corrugated Sheet or Sandwich Panel;
Window: PVC or Aluminum Alloy Frame Window;
Gate: Sliding Industrial Door or Roller Shutter Door;
Option: Skylight Belt, Ventilation Fitting, Gutter, Crane;
|