Climb Monkey Ladder for Construction

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$1.00-30.00 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Ringlock Scaffolding
  • Construction Properties Installation Scaffold
  • Transport Package Steel Pallet
  • Specification 3′,5′ and 10′ long are available
  • Trademark TP Scaffold
  • Origin Jiangsu, China

Product Description

Scaffolding ladder 1.Made of high strength steel.It is designed and manufactured to be compatible with ringlock system and cuplock system scaffolding. 2.The out diameter and thickness of the vertical tubes of the ladder are 35x2mm,horizontal support tubes are 26×1.8mm. 3. ...

Learn More

Scaffolding Comparison
Transaction Info
Price US $ 1.00-30.00/ Piece Negotiable US $ 1/ Piece US $ 1/ Piece US $ 0.50-1.50/ Piece
Min Order 1 Pieces 100 Pieces 1 Pieces 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T L/C, T/T L/C, T/T, Paypal
Quality Control
Management System Certification - ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, BSCI, ANSI/ESD, ASME ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Western Europe North America, South America, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, Others OEM, ODM, Own Brand OEM, ODM OEM, ODM OEM
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Ringlock Scaffolding;
Construction Properties: Installation Scaffold;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Construction Properties: Installation Scaffold;
Scaffold Ladder: Construction Scaffolding;
Scaffolding Price: Steel Prop;
Used Scaffolding: Andamios;
Scaffold Tower: Scaffolding Ladder;
Scaffolding Wheels: Octagonlock Scaffolding;
Construction Scaffold: Scaffolding with Stairs;
Frame Scaffolding: Scaffolding for Sale;
Scaffold in Floor: Scaffolding Accessories;
Scaffold Rail: Scaffold Boards;
Scaffold Building: Scaffolding Cantilever;
Scaffolder: Scaffold Piercing;
Scaffolding Parts: Scaffold Types;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Steel Material: Q235,Q345;
Diameter: 48.3 mm;
Thickness: 3.2 mm;
Finished: HDG;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Steel Material: Q235,Q345;
Diameter: 48.3 mm;
Thickness: 3.2 mm;
Finished: HDG;
After-sales Service: Yes;
Warranty: Years;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Raw Material: Metal;
Grand: Q235;
Surface Treatment: Electro Galvaznied/Hot DIP Galvanized;
Usage: 48.3/48.6mm Pipe;
Production Procedure: Pressed;
Market: Overseas;
Function: Export;
Supplier Name

Nanjing Tuopeng Construction Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

RAPID Scaffolding (Engineering) Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Wuxi Metec Metal Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Tianjin Huayou Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier