Frame Scaffolding Drop Locks for Sale

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$0.25-0.50 / Piece

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Projecting Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Drop Lock Pin
  • Construction Properties Installation Scaffold
  • Transport Package Bags and Steel Pallet
  • Specification 12.5mm
  • Trademark Everprime Scaffold
  • Origin Jiangsu, China
  • Item Scaffolding Drop Lock
  • Surface Finish Electro Galvanized,Self Color
  • Color Silver
  • System Frame

Product Description

Frame Scaffolding drop locks for Sale 1. Drop locks are welded on frame scaffolding vertical tubes to lock cross braces and guard rails. It is made of 1/2" (12.5mm)diameter rod with swivel bar assembled 2. Many types of lock pins are supplied here: Canadian lock, V lock pin,f lip lock pin, etc. ...

Learn More

Scaffolding Drop Locks Comparison
Transaction Info
Price US $ 0.25-0.50/ Piece US $ 200.00-220.00/ Set Negotiable Negotiable Negotiable
Min Order 1 Pieces 1 Sets 1000 Pieces 1000 Pieces 1000 Pieces
Trade Terms - EXW - - -
Payment Terms L/C, T/T T/T, Western Union, cash L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification - TUV - - -
Management System Certification - ISO 9001 ISO 9001, FSC ISO 9001, FSC ISO 9001, FSC
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic East Asia(Japan/ South Korea) East Asia(Japan/ South Korea) East Asia(Japan/ South Korea)
Annual Export Revenue - - - - -
Business Model OEM, Others OEM OEM, Own Brand OEM, Own Brand OEM, Own Brand
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Drop Lock Pin;
Construction Properties: Installation Scaffold;
Item: Scaffolding Drop Lock;
Surface Finish: Electro Galvanized,Self Color;
Color: Silver;
System: Frame;
Material: Aluminum;
Type: Mobile;
Structural Style: Tower Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Single Row Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Main Tube: 50*3mm;
Braces: 20*2mm;
Dimension(L*W): 200*135cm;
Height: 2-40m;
Color: Aluminum Silver;
Usage: Event,Wedding Advertising Exhibition;
Quality: Excellent;
Keyword: Aluminum Stair Scaffolding;
Service Time: 7 Years;
Material: Timber;
Type: Fixed;
Structural Style: Soffit Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Cross Ring Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Material: Timber;
Type: Fixed;
Structural Style: Soffit Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Cross Ring Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Material: Timber;
Type: Fixed;
Structural Style: Soffit Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Projecting Scaffolding;
Lapping Form: Cross Ring Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Building Scaffold;
Supplier Name

Nanjing Tuopeng Construction Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

FOSHAN DRAGON STAGE EQUIPMENT CO.,LTD

China Supplier - Diamond Member Audited Supplier

Weifang Suntop Imp. and Exp. Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Weifang Suntop Imp. and Exp. Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Weifang Suntop Imp. and Exp. Co., Ltd.

China Supplier - Diamond Member Audited Supplier