Building Props
US$9.00-15.00 / Set
View
  • Recommend for you
  • What is High Quality Q235 Ringlock Scaffolding Swivel Base Jack Accessories Adjustable Screw Jack Base
  • What is Galvanized Scaffold Metal Aluminum Walk Board Steel Deck Plank for Construction
  • What is Scaffolding Shoring Props Puntales Metalicos Galvanizados PARA Construccion

What is Q235 Steel Scaffolding Adjust Shoring Prop for Scaffolding Support Pipe

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1000 Sets US$9.00-15.00 / Set

Sepcifications

  • After-sales Service 24 Hours Full Time Service
  • Warranty One Year
  • Material Steel
  • Type Fixed
  • Erection Position Internal Scaffolding
  • Scaffolding Part Type Scaffolding Props
  • Transport Package Steel Strip
  • Trademark Wufang
  • Origin China

Product Description

1. Heavy Duty Prop(With Normal Nut) Min Max Inner Tube Outer Tube 1.8m 3.2m 48mm 60mm 2m 3.6m 48mm 60mm 2.2m 3.9m 48mm 60mm 2.5m 4.5m 48mm 60mm 3m 5.5m 48mm 60mm 2. Light Type Prop(With Cup Nut) ...

Learn More

Building Props Comparison
Transaction Info
Price US $ 9.00-15.00/ Set US $ 7.00-25.00/ Piece US $ 7.00-25.00/ Piece US $ 7.00-25.00/ Piece US $ 7.00-25.00/ Piece
Min Order 1000 Sets 50 Pieces 50 Pieces 50 Pieces 50 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, Western Union, cash L/C, T/T, Western Union, cash L/C, T/T, Western Union, cash L/C, T/T, Western Union, cash
Quality Control
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets Southeast Asia/ Mideast, Domestic Southeast Asia/ Mideast, Africa, Domestic Southeast Asia/ Mideast, Africa, Domestic Southeast Asia/ Mideast, Africa, Domestic Southeast Asia/ Mideast, Africa, Domestic
Annual Export Revenue - - - - -
Business Model OEM, Own Brand OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
After-sales Service: 24 Hours Full Time Service;
Warranty: One Year;
Material: Steel;
Type: Fixed;
Erection Position: Internal Scaffolding;
Scaffolding Part Type: Scaffolding Props;
After-sales Service: Yes;
Warranty: 3years;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: DIP Painted/Powder Coated/Hot-DIP Galvanized;
Techinique: CO2 Arc Welded;
Color: Red/Silver/Blue/Grey or Customized;
Working Life: 5-7 Years;
After-sales Service: Yes;
Warranty: 3years;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: DIP Painted/Powder Coated/Hot-DIP Galvanized;
Techinique: CO2 Arc Welded;
Color: Red/Silver/Blue/Grey or Customized;
Working Life: 5-7 Years;
After-sales Service: Yes;
Warranty: 3years;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: DIP Painted/Powder Coated/Hot-DIP Galvanized;
Techinique: CO2 Arc Welded;
Color: Red/Silver/Blue/Grey or Customized;
Working Life: 5-7 Years;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: High Formwork;
Erection Position: External Scaffolding;
Move Method: Horizontal mobile Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Treatment: DIP Painted/Powder Coated/Hot-DIP Galvanized;
Techinique: CO2 Arc Welded;
Color: Red/Silver/Blue/Grey or Customized;
Working Life: 5-7 Years;
Supplier Name

Tangshan Wufang Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Jianyi Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Jianyi Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Jianyi Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Foshan Jianyi Scaffolding Co., Ltd.

China Supplier - Diamond Member Audited Supplier