Scaffolding Standards
Negotiable
View
  • Recommend for you
  • What is Aluminium O Access Hatch Deck with Access Ladder for Ringlock Allround System Scaffolding
  • What is Scaffolding Adjustable U Head Jack Formwork U Head Screw Support Jack
  • What is Ring Lock Scaffolding Accessories Rosette Ring Clamps Couplers

What is Instant Access Scaffolding System Galvanized Cuplock Scaffolding Standards

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1000 Pieces Negotiable

Sepcifications

  • Material Steel
  • Type Fixed
  • Structural Style Multi-Pole Scaffolding
  • Framework Combined Scaffolding
  • Supporting Mode Floor Type Scaffolding
  • Lapping Form Full Scaffolding
  • Erection Position External Scaffolding
  • Move Method Attached Lifting Scaffolding
  • Scaffolding Part Type Scaffolding Frames
  • Construction Properties Building Scaffold
  • Transport Package Pallets/Bundles
  • Specification OD48.3x3.2mm
  • Trademark Wellmade
  • Origin China
  • Surface Hot DIP Galvanized
  • Joint Joint Pin Spigot
  • Compoents Cup Lock System Standards

Product Description

Cuplock scaffolding is one of modular instant types of scaffolding with standard scaffolding components and parts of scaffolding standards, scaffolding ledgers, scaffolding transom, adjustable jack base, u head screw jacks, intermediate transom support, steel planks with hooks. Cuplock scaffolding ...

Learn More

Scaffolding Standards Comparison
Transaction Info
Price Negotiable Negotiable US $ 6.00-6.50/ Piece US $ 3.00-30.00/ Piece US $ 3.00-30.00/ Piece
Min Order 1000 Pieces 100 Pieces 500 Pieces 100 Pieces 100 Pieces
Trade Terms - - - - -
Payment Terms L/C L/C, T/T L/C, T/T L/C, T/T, Western Union L/C, T/T, Western Union
Quality Control
Product Certification - - - ISO, Ce, SGS ISO, Ce, SGS
Management System Certification ISO 9001, ISO 9000, ISO 14001, BS 25999-2 ISO 9001 ISO 9001, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001 ISO 9001, ISO 14001, BRC ISO 9001, ISO 14001, BRC
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Mid East, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic Europe, Southeast Asia/ Mideast, Domestic Europe, Southeast Asia/ Mideast, Domestic
Annual Export Revenue - - - - -
Business Model OEM, ODM, Own Brand OEM OEM, ODM, Own Brand OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Off-season: 1 Month(s)
Peak-season: 6-12 Month(s)
Product Attributes
Specification
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface: Hot DIP Galvanized;
Joint: Joint Pin Spigot;
Compoents: Cup Lock System Standards;
After-sales Service: One Year Warranty;
Warranty: One Year Warranty;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Combined Scaffolding;
Supporting Mode: Floor Type Scaffolding;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: Attached Lifting Scaffolding;
Scaffolding Part Type: Scaffolding Couplers;
Construction Properties: Installation Scaffold;
After-sales Service: Online Technical Support;
Material: Steel;
Erection Position: Internal Scaffolding;
Scaffolding Part Type: Scaffolding Props;
Outer Tube: 60/56/48mm;
Inner Tube: 48/40mm;
Tube Thickness: 1.6-4.0mm;
Adjustable Length: 2400-3900mm, 2000-3500mm, 3000-5500mm or as Per Yo;
Surface Treatment: Hot Dipped Galvanized, Pre Galvanized, Painted, Po;
Model: Light-Duty, Heavy-Duty;
Color: Customer′s Request;
Delivery Time: 25-30 Days;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Material: Steel;
Type: Fixed;
Structural Style: Multi-Pole Scaffolding;
Framework: Frame Combined Scaffolding;
Supporting Mode: Floor or Suspended;
Lapping Form: Full Scaffolding;
Erection Position: External Scaffolding;
Move Method: as Customer Work Need;
Scaffolding Part Type: Scaffolding Frames;
Construction Properties: Building Scaffold;
Surface Finished: Hot Dipped Galvanization;
Supplier Name

Nanjing Wellmade Metalwork Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Ningbo Yinzhou Nord Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Tianjin Youfa International Trade Co., Ltd.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier

HONGDE RUILIN METAL STRUCTURE MANUFACTURING CO., LTD.

China Supplier - Diamond Member Audited Supplier