Specification |
Type: Copper Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Pipe / Tube;
Surface: Mill, Polished, Bright, Hair Line, etc.;
MOQ: 1 Ton;
Delivery Time: Within 10 Days;
Technical: Hot Rolled, Cold Rolled.;
Payment Term: T/T;
Delivery Term: EXW, Fob, CFR, CIF.;
|
Type: Copper Strips;
Material: Red Copper;
Shape: Coil;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Coil / Strip;
Surface: Mill, Polished, Bright, Hair Line, etc.;
MOQ: 1 Ton;
Delivery Time: Within 10 Days;
Technical: Hot Rolled, Cold Rolled.;
Payment Term: T/T;
Delivery Term: EXW, Fob, CFR, CIF.;
|
Type: Copper Pipe;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Pipe / Tube;
Surface: Mill, Polished, Bright, Hair Line, etc.;
MOQ: 1 Ton;
Delivery Time: Within 10 Days;
Technical: Hot Rolled, Cold Rolled.;
Payment Term: T/T;
Delivery Term: EXW, Fob, CFR, CIF.;
Processing Service: Bending, Decoiling, Welding, Punching, Cutting;
Cu (Min): 99%;
Sample: Available;
Diameter: 5mm-200mm or Customized;
Thickness: 0.2mm-5mm or Customized;
|
Type: Copper Pipe;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Pipe / Tube;
Surface: Mill, Polished, Bright, Hair Line, etc.;
MOQ: 1 Ton;
Delivery Time: Within 10 Days;
Technical: Hot Rolled, Cold Rolled.;
Payment Term: T/T;
Delivery Term: EXW, Fob, CFR, CIF.;
Processing Service: Bending, Decoiling, Welding, Punching, Cutting;
Cu (Min): 99%;
Sample: Available;
Diameter: 5mm-200mm or Customized;
Thickness: 0.2mm-5mm or Customized;
|
Type: Copper Sheets;
Material: Red Copper;
Shape: Plate;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Plate/Sheet;
Surface: Mill, Polished, Bright, Hair Line, etc.;
MOQ: 1 Ton;
Delivery Time: Within 10 Days;
Technical: Hot Rolled, Cold Rolled.;
Payment Term: T/T;
Delivery Term: EXW, Fob, CFR, CIF.;
|