Innovative Lightning Strike Prevention Device with Lightning Rod Protector

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Pieces US$90.00-110.00 / Piece

Sepcifications

  • Type Power Source Arrester
  • Structure Zinc Oxide Arrester
  • Installation Parallel Arrester
  • Application AC/DC System
  • Size Small
  • Operation Voltage High Voltage
  • Shape Cuboid
  • Material ZnO
  • Certification ROHS, ISO9001
  • Brand Chaotai
  • Transport Package Export Standard Packing
  • Specification Pallet dimension 110x110x210
  • Trademark chaotai
  • Origin Wenzhou, China

Product Description

Product Description General Introducing the (H)GW9 outdoor high voltage switch equipment, an exceptional single-phase AC 50Hz device. Designed for power systems with a rated voltage of 10kV, this product is perfect for managing power supply under voltage and no-load conditions with remarkable ...

Learn More

Lightning Strike Prevention Device Comparison
Transaction Info
Price US $ 90.00-110.00/ Piece US $ 8.4/ Piece US $ 9.2/ Piece US $ 14.6/ Piece US $ 10.7/ Piece
Min Order 10 Pieces 10000 Pieces 10000 Pieces 10000 Pieces 10000 Pieces
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T L/C, T/T L/C, T/T L/C, T/T
Quality Control
Product Certification ROHS, ISO9001 ISO9001 ISO9001 ISO9001, BV ISO9001
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets South America, Eastern Europe, Southeast Asia, Africa, Eastern Asia Mid East, Eastern Asia Mid East, Eastern Asia Mid East, Eastern Asia Mid East, Eastern Asia
Annual Export Revenue US$50 Million - US$100 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million
Business Model OEM, ODM OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 6-12 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 6-12 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 6-12 months
Off Season Lead Time: 1-3 months
Peak Season Lead Time: 6-12 months
Product Attributes
Specification
Type: Power Source Arrester;
Structure: Zinc Oxide Arrester;
Installation: Parallel Arrester;
Application: AC/DC System;
Size: Small;
Operation Voltage: High Voltage;
Shape: Cuboid;
Material: ZnO;
Brand: Chaotai;
Type: Power Source Arrester;
Structure: Zinc Oxide Arrester;
Installation: Parallel Arrester;
Application: Power Plants;
Size: Meidum;
Operation Voltage: High Voltage;
Shape: Spiral;
Material: Ceramic;
Brand: Xirui;
Voltage: 15kv;
Type: Power Source Arrester;
Structure: Zinc Oxide Arrester;
Installation: Parallel Arrester;
Application: Power Plants;
Size: Meidum;
Operation Voltage: High Voltage;
Shape: Spiral;
Material: Ceramic;
Brand: Xirui;
Color: White;
Umbrella: 15 PCS;
Type: Power Source Arrester;
Structure: Zinc Oxide Arrester;
Installation: Parallel Arrester;
Application: Power Plants;
Size: Meidum;
Operation Voltage: High Voltage;
Shape: Spiral;
Material: Ceramic;
Brand: Xirui;
Color: White;
Umbrella: 23 PCS;
Type: Power Source Arrester;
Structure: Zinc Oxide Arrester;
Installation: Parallel Arrester;
Application: Power Plants;
Size: Meidum;
Operation Voltage: High Voltage;
Shape: Spiral;
Material: Ceramic;
Brand: Xirui;
Umbrella: 23 PCS;
Supplier Name

Zhejiang Chaotai Complete Equipment Co., Ltd.

Diamond Member Audited Supplier

Zhejiang Xirui High-Voltage Electric Co., Ltd.

Diamond Member Audited Supplier

Zhejiang Xirui High-Voltage Electric Co., Ltd.

Diamond Member Audited Supplier

Zhejiang Xirui High-Voltage Electric Co., Ltd.

Diamond Member Audited Supplier

Zhejiang Xirui High-Voltage Electric Co., Ltd.

Diamond Member Audited Supplier