Specification |
Type: According to Customer Requirements;
Product Name: Steel Structure Building;
Usage: Storage, Work, Live;
Material: Steel Column or Beam;
Roof and Wall: Steel Sheet or Sandwich Panel;
Windows and Doors: Customized;
Color: Customized;
Earthquake Load: 8 Grade;
Life Span: 50 Years;
Grade: a+;
Certificates: SGS/CE/ISO;
Designing: Sketchup.Autocad;
Application: Steel Workshop, Steel Structure Platform;
Forming: Hot-Rolled Steel;
Connection Form: Bolt Connection;
Member: Steeltruss;
|
After-sales Service: Supply Installation Drawing and Spare Materials;
Raw Materials: Q235/Q345;
Life Time of Steel Frame: More Than 50 Years;
Roof and Wall Panel: EPS/Rock Wool/Polyurethane/MGO/Cement Foam Panel;
Gutter: Color Steel Sheet, Galvanized Steel, Stainless Steel;
Packing Method: Flat Pack, Open Top Container, by Steel Skid, etc.;
Type: H-Section Steel;
Standard: GB, ASTM, BS, SGS;
Steel Type: Carbon Structural Steel;
Forming: Hot-Rolled Steel;
Connection Form: Bolt Connection;
Member: Steel Column;
Type of Steel For Building Structure: High-Strength Steel;
Carbon Structural Steel: Q235;
Residential Wall Structure: Wall Support;
Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge, Steel Structure House;
Warranty: 1 Year Under Normal Use;
|
After-sales Service: Installation Drawing, Installation Video;
Usage: Indoor, Steel Warehouse, Workshop, Steel Building, Steel Shed;
Drawing: Design Plan Drawing, Install Shop Drawing;
Wind Against: 80~280km Per Hour;
Snow Load: 30~200kg Per Sqm;
Earthquake Against: 7~9 Grade;
Roof Pitch: 10%, 12%, 16%, 25%, 30%etc;
Bay: 5m, 6m, 7, 9m etc;
Column & Rafter: H Section Steel;
Tie Beam: Round Pipe or Square Tube;
Purlin: C Purlin, Z Purlin, Hot Rolled H Beam Purlin;
Roof & Wall Coverage: Single Corrugated Sheet or Sandwich Panel;
Window: PVC or Aluminum Alloy Frame Window;
Gate: Sliding Industrial Door or Roller Shutter Door;
Option: Skylight Belt, Ventilation Fitting, Gutter, Crane;
Standard: GB, ASTM, DIN, BS, En1090;
Steel Type: Quality Carbon Structural Steel and Alloy Structural Steel;
Connection Form: Bolt Connection;
Type of Steel For Building Structure: High-Strength Steel;
Residential Wall Structure: Wall Support;
Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Steel Warehouse, Steel Building, Steel Shed;
Warranty: 30 Years;
Type: Steel Structure Horse Riding Arena;
Forming: Weld, Hot-Rolled Steel, Cold Drawn Steel, Forging;
Member: Steel H Column, H Beam, Purlin, Tie Beam, Coverage Et;
Carbon Structural Steel: Q355b, Q235B, A36 etc;
|
After-sales Service: Installation Drawing, Installationvideo;
Drawing: Design Plan Drawing, Install Shop Drawing;
Wind Against: 80~280km Per Hour;
Snow Load: 30~200kg Per Sqm;
Earthquake Against: 7~9 Grade;
Roof Pitch: 10%, 12%, 16%, 25%, 30%etc;
Bay: 5m, 6m, 7, 9m etc;
Column & Rafter: H Section Steel;
Tie Beam: Round Pipe or Square Tube;
Purlin: C Purlin, Z Purlin, Hot Rolled H Beam Purlin;
Roof Coverage: Single Corrugated Sheet or Sandwich Panel;
Wall Coverage: Single Corrugated Sheet or Sandwich Panel;
Window: PVC or Aluminum Alloy Frame Window;
Gate: Sliding Industrial Door or Roller Shutter Door;
Option: Skylight Belt, Ventilation Fitting, Gutter, Crane;
Standard: GB, ASTM, DIN, BS, En1090;
Steel Type: Quality Carbon Structural Steel and Alloy Structural Steel;
Connection Form: Bolt Connection;
Type of Steel For Building Structure: High-Strength Steel;
Residential Wall Structure: Wall Support;
Application: Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing;
Warranty: 30 Years;
Type: Pig Farm Building;
Forming: Weld, Hot-Rolled Steel, Cold Drawn Steel, Forging;
Member: Steel H Column, H Beam, Purlin, Tie Beam, Coverage Et;
Carbon Structural Steel: Q355b, Q235B, A36 etc;
|
After-sales Service: Installation Drawing, Installation Video;
Usage: Industry;
Drawing: Free Design Drawing, 2D& 3D Version;
Wind,Snow,Earthquake Resistance: 80~280km/H, 30~200kg/M2, Grade 9;
Frame: Steel Portal Frame Building;
Delivery Time: 4~6 Weeks;
Certificate: ISO, CE, Third Party Inspect;
Roof Pitch: 10%, 12%, 16%, 25%, 30%etc;
Bay: 5m, 6m, 7, 9m etc;
Column & Rafter: Hot Rolled H Beam or I Beam;
Tie Beam: Round Pipe or Square Tube;
Purlin: C Purlin, Z Purlin, Hot Rolled H Beam Purlin;
Roof Coverage: Single Corrugated Sheet or Sandwich Panel;
Wall Coverage: Single Corrugated Sheet or Sandwich Panel;
Window: PVC or Aluminum Alloy Frame Window;
Gate: Sliding Industrial Door or Roller Shutter Door;
Option: Skylight Belt, Ventilation Fitting, Gutter, Crane;
|