Specification |
Color: Customize;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: Extruded;
Grade: 3000 Series;
Temper: O - H112;
Surface Treatment: Polished;
Alloy: Alloy;
MOQ: 1 Ton;
Delivery Time: 7-14 Days;
Width: 100-1500mm or as Required;
Thickness: 0.25-3.0mm or as Required;
Payment: 30%T/T;
Price Term: CIF CFR Fob Ex-Work;
Length: or Required;
Processing Service: Welding, Punching, Cutting, Bending, Decoiling;
Tolerance: 1%;
Inspection Method: Can Be Inspected by a Third-Party Testing Agency B;
|
Color: Aluminum Primary Color;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations, Building and Thermal Insulation Works;
Technique: Casting and Rolling;
Grade: 1000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Non-alloy;
Weight Per Coil: 100kgs, 200kgs, 250kgs, 300kgs, 500kgs, 1000kgs;
MOQ: 3000kgs;
Surface: Mill Finish;
Production Time: 15~20 Days;
Port of Loading: Qingdao Port, China;
|
Color: All Coloir;
Technique: Painted;
Grade: 3000 Series;
Temper: T351 - T651;
Surface Treatment: Coated;
Alloy: Non-alloy;
|
Color: Aluminum Primary Color;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations, Building and Thermal Insulation Works;
Technique: Casting and Rolling;
Grade: 3000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Non-alloy;
Weight Per Coil: 100kgs, 200kgs, 250kgs, 300kgs, 500kgs, 1000kgs;
MOQ: 3000kgs;
Surface: Mill Finish;
Production Time: 15~20 Days;
Port of Loading: Qingdao Port, China;
|
Color: Aluminum Primary Color;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations, Building and Thermal Insulation Works;
Technique: Casting and Rolling;
Grade: 3000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Weight Per Coil: 100kgs, 200kgs, 250kgs, 300kgs, 500kgs, 1000kgs;
MOQ: 3000kgs;
Surface: Mill Finish;
Production Time: 15~20 Days;
Port of Loading: Qingdao Port, China;
|