Specification |
Type: Seamless;
Technique: Cold Rolled;
Material: Alloy Steel;
Surface Treatment: Polished;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Tolerance: 10%;
Length: 1-12m/Custom;
Thickness: 1-60mm;
|
Type: Seamless;
Technique: Hot Rolled;
Material: Alloy Steel;
Surface Treatment: Black;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling;
Section Shape: Round;
Length: 1-12m;
Wt: 1mm-150mm;
Delivery Time: 15-30 Days After Down Payment;
Alloy or Not: Alloy;
Secondary or Not: Non Secondary;
Standard or Not: Standard;
Price Term: Fob, CIF, CNF;
Payment: L/C, T/T;
MOQ: as Requested;
|
Type: Seamless;
Technique: Cold Drawn;
Material: Alloy Steel;
Surface Treatment: Black;
Usage: Pipeline Transport, Boiler Pipe, Chemical Industry, Special Purpose;
Section Shape: Round;
Length: 1-12m;
Wt: 1mm-200mm;
End Protection: Plastic Caps;
Delivery Time: 15-30 Days After Down Payment;
Alloy or Not: Alloy;
Secondary or Not: Non Secondary;
Standard or Not: Standard;
Price Term: Fob, CIF, CNF;
Payment: L/C, T/T;
|
Type: Seamless;
Technique: Cold Drawn;
Material: Carbon Steel;
Surface Treatment: Oiled;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling;
Section Shape: Round;
Length: 1-12m;
Thickness: 1.2-9.5mm;
Delivery Time: 15-30 Days After Down Payment;
Process: Cold Draw, Cold Rolled, etc.;
Alloy or Not: Non Alloy;
Standard or Not: Standard;
Secondary or Not: Non Secondary;
Price Term: Fob, CIF, CNF;
Payment: L/C, T/T;
|
Type: Welded;
Technique: ERW;
Material: Carbon Steel;
Surface Treatment: 2lpe/2PP;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling;
Section Shape: Round;
Length: 1-12m;
Delivery Time: 15-30 Days After Down Payment;
Wall Thickness: 6 - 25 mm;
Alloy or Not: Non-Alloy;
Secondary or Not: Non-Secondary;
Standard or Not: Standard;
Payment: L/C, T/T;
Price Term: Fob, CIF, CNF;
MOQ: as Requested;
|