Alkaline Bipolar for Electrolyzer Water Hydrogen Producation Accessories

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece US$29.99-299.99 / Piece

Sepcifications

  • Usage Hydrogen
  • Purpose Gas Manufacturing
  • Parts Other
  • Application Fields New Energy
  • Noise Level Low
  • Machine Size Small
  • Condition New
  • Transport Package Carton Packing
  • Specification Customized
  • Trademark OEM
  • Origin China
  • Material 316stainless Steel or Carbon Steel
  • Coating Nickel Plating
  • Coating Way Electroplate or Chemical Plating
  • Thickness Customized

Product Description

Alkaline bipolar(Plate And Frame Filter) The bipolar plate acts as a barrier between two adjacent electrolytic cells and is made of coated titanium plates for durability,Processing Matching Of Core Components (Bipolar Plates): 1,Electrode plate (papilla structure) 2,End pressure plate, end ...

Learn More

Bipolar Comparison
Transaction Info
Price US $ 29.99-299.99/ Piece US $ 5.00-8.50/ Piece US $ 12,000.00-15,000.00/ set US $ 245.00-268.00/ Piece US $ 248.00-280.00/ Piece
Min Order 1 Pieces 50 Pieces 1 set 1 Pieces 1 Pieces
Trade Terms - - - - -
Payment Terms T/T L/C, T/T, D/P, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification - - ISO, CE ISO, CE ISO, CE
Management System Certification ISO 9000 ISO 9001, ISO 14001, ISO 20000, OHSAS/ OHSMS 18001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Europe, Southeast Asia/ Mideast, Africa, Domestic Europe Europe
Annual Export Revenue - - - - -
Business Model OEM OEM, ODM OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Usage: Hydrogen;
Purpose: Gas Manufacturing;
Parts: Other;
Application Fields: New Energy;
Noise Level: Low;
Machine Size: Small;
Condition: New;
Material: 316stainless Steel or Carbon Steel;
Coating: Nickel Plating;
Coating Way: Electroplate or Chemical Plating;
Thickness: Customized;
Usage: Oxygen;
Standard or Nonst: Standard;
Power: Manual;
Material Brass: Brass Hpb59-1;
Port Size: Outlet Female Thread Cga580, Outletgb8335 Pz27.8;
Pressure: Medium Pressure(15MPa);
Structure: Shutoff;
Temperature of Media: Normal Temperature;
Loading Port: Shanghai Port;
Delivery Time: Within 15 Days;
Usage: Oxygen;
Purpose: Gas Manufacturing;
Parts: Adsorption Tower;
Application Fields: Medical;
Noise Level: Low;
Machine Size: Medium;
Condition: New;
After-Sales&Nbsp;Service&Nbsp;Provided: Engineers Available;
Product&Nbsp;Name: Air&Nbsp;Separation&Nbsp;Plant;
Color: White/&Nbsp;Customised;
Purity: 90%-99.5%;
Capacity: 1-200nm3/H;
Material: Carbon&Nbsp;Steel;
Type: Pressure&Nbsp;Swing&Nbsp;Adsorption(Psa);
Technology: Psa&Nbsp;System;
Application: General&Nbsp;Industrial&Nbsp;Fields;
Usage: Hydrogen, Nitrogen, Ng and LPG;
Purpose: Control Gas;
Parts: Burner Controller;
Application Fields: Industrial Gas Burner;
Noise Level: Ultra Quiet;
Machine Size: Medium;
Condition: New;
Model: R7849A1098;
Brand: Honeywell;
Name: Controller Amplifier;
Use: Gas Burner Accessories;
Environment Temperature: Normal;
Customize: Yes;
Deliver Time: 2-15days;
Term of Payment: EXW/Fob;
After Warranty Service: Video Technical Support;
Usage: Hydrogen, Nitrogen, Ng and LPG;
Purpose: Control Gas;
Parts: Burner Controller;
Application Fields: Industrial Gas Burner;
Noise Level: Ultra Quiet;
Machine Size: Medium;
Condition: New;
Model: R7861A1034;
Brand: Honeywell;
Name: Controller Amplifier;
Use: Gas Burner Accessories;
Environment Temperature: Normal;
Customize: Yes;
Deliver Time: 2-15days;
Term of Payment: EXW/Fob;
After Warranty Service: Video Technical Support;
Supplier Name

XJ Baoqing LTD

China Supplier - Gold Member Audited Supplier

Nanjing Pipegas Industrial Co., Ltd.

China Supplier - Gold Member Audited Supplier

Suzhou Hengda Purification Equipment Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shenzhen YHG Heating Science & Technology Co., ltd

China Supplier - Gold Member Audited Supplier

Shenzhen YHG Heating Science & Technology Co., ltd

China Supplier - Gold Member Audited Supplier