Specification |
After-sales Service: One Year;
Warranty: One Year;
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Galvanized;
Technique: Cold Rolled;
Application: Boiler Plate;
Edge: Slit edge;
Stock: Stock;
Materials: Dx51d/Dx52D/Dx53D/Dx54D/SGCC/Dx51d/Dx52D/Dx53D;
Thickness: 0.12 - 6mm or as Require;
Width: 600mm to 1500mm or as Require;
Zinc Coating: 30-275g / M2 or as Request;
MOQ: 1 Ton;
Hardness: Soft Hard(60), Medium Hard (Hrb60-85), Full Hard (;
Processing Service: Bending, Welding, Returning, Cutting, Punching;
Coil Weight: 3-5 Tons;
Surface Structure: Regular Spangle,Minimum Spangle, Zero Spangle, Big;
Usage: Building & Construction:Roofing; Terrace; Window F;
|
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Galvanized;
Technique: Hot Rolled;
Application: Boiler Plate;
Edge: Slit edge;
Stock: Stock;
Payment: Tt30% Advance+70% Against Bl;
Delivery: 7-20 Days;
Thicness: 0.12-6.0mm or Customer's Requirement;
Width: 600-1500mm According to Customer's Requirement;
Zinc Coating: 30-275G/M2;
Coil Weight: 3-20 Metric Ton Per Coil;
|
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Galvanized;
Technique: Hot Rolled;
Application: Boiler Plate;
Edge: Slit edge;
Stock: Stock;
Payment: Tt30% Advance+70% Against Bl;
Delivery: 7-20 Days;
Thicness: 0.12-6.0mm or Customer's Requirement;
Width: 600-1500mm According to Customer's Requirement;
Zinc Coating: 30-275G/M2;
Coil Weight: 3-20 Metric Ton Per Coil;
|
After-sales Service: 1 Year;
Warranty: 1 Year;
Standard: ASTM, JIS, GB, AISI, DIN, BS;
Surface Treatment: Galvanized;
Technique: Hot Rolled;
Application: Boiler Plate;
Edge: Slit edge;
Stock: Stock;
Payment: Tt30% Advance+70% Against Bl;
Delivery: 7-20 Days;
|
Standard: ASTM, JIS, GB, AISI, DIN;
Surface Treatment: Coated;
Technique: Hot Rolled;
Application: Ship Plate;
Edge: Slit edge;
Stock: Stock;
Product Name: Color Coated Roofing Sheet;
Materials: SGCC Dx51d Dx53D;
Type: Corrugated Sheets;
Thickness: 0.12-0.8mm;
Width: 600-1500mm;
Zinc Coating: 30-500G/M2;
Color: Ral;
Surface: Finished or Unfinished;
MOQ: 5 Ton;
Payment: Tt LC;
Delivery: Within 7days;
Application Usage: Construction Home Building;
|