Specification |
After-sales Service: Available;
Warranty: 1 year;
Application: Underground Mine;
Overall Size: 7490X2150X2471mm;
Min Ground Clearance: 348mm;
Box Lift Height: 4248mm;
Wheelbase: 3626mm;
Turning Angle: 45degree;
Dump Box Volume: 7.5cbm;
Tramming Capacity: 15000kg;
Turning Radius: 3500 / 6100 mm;
Engine: Deutz Bf6m1013ec;
Optional Engine: Cummins Qsb6.7-C300/Deutz F8l413W/Volvo Tad850ve;
Converter: Dana C273 or C313;
Transmission: Dana Rt32000 Series;
Axle: Metorior Cy-2jeaf/R Rigid Planetary Axle;
Tire: Aeolus 14.00-24 Pr36 L-5s Tt;
|
Function: Gold Recovery;
Type: Gold Mining Equipment;
Main materials: Steel;
Installation: Portable, Bobile, Fixed;
Capacity: 1-50 tph;
Application: Gold Mines;
Driving: Electric Motor, Diesel Engine;
Supply Voltage: 127/220V,220/380V,230/400V,240/415V,400/690V;
Gold Recovery Rate: 65-99%;
Processed Raw Materials: Placer, Alluvial/Eluvial, Hark Rock, Tailings;
Installation Position: Indoor, Outdoor;
Warranty period: 365 Days;
Customization: Acceptable;
Color: Multi, Selectable;
|
Function: Gold Recovery;
Type: Gold Mining Equipment;
Main materials: Steel;
Installation: Portable, Bobile, Fixed;
Capacity: 1-50 tph;
Application: Gold Mines;
Driving: Electric Motor, Diesel Engine;
Supply Voltage: 127/220V,220/380V,230/400V,240/415V,400/690V;
Gold Recovery Rate: 65-99%;
Processed Raw Materials: Placer, Alluvial/Eluvial, Hark Rock, Tailings;
Installation Position: Indoor, Outdoor;
Warranty period: 365 Days;
Customization: Acceptable;
Color: Multi, Selectable;
|
Function: Gold Recovery;
Type: Gold Mining Equipment;
Main materials: Steel;
Installation: Portable, Bobile, Fixed;
Capacity: 1-50 tph;
Application: Gold Mines;
Driving: Electric Motor, Diesel Engine;
Supply Voltage: 127/220V,220/380V,230/400V,240/415V,400/690V;
Gold Recovery Rate: 65-99%;
Processed Raw Materials: Placer, Alluvial/Eluvial, Hark Rock, Tailings;
Installation Position: Indoor, Outdoor;
Warranty period: 365 Days;
Customization: Acceptable;
Color: Multi, Selectable;
|
Function: Gold Recovery;
Type: Gold Mining Equipment;
Main materials: Steel;
Installation: Portable, Bobile, Fixed;
Capacity: 1-50 tph;
Application: Gold Mines;
Driving: Electric Motor, Diesel Engine;
Supply Voltage: 127/220V,220/380V,230/400V,240/415V,400/690V;
Gold Recovery Rate: 65-99%;
Processed Raw Materials: Placer, Alluvial/Eluvial, Hark Rock, Tailings;
Installation Position: Indoor, Outdoor;
Warranty period: 365 Days;
Customization: Acceptable;
Color: Multi, Selectable;
|