Specification |
Color: White;
MOQ: 50;
Export Markets: Global;
Sample Time: 2-5days;
Bulk Order Time: 10-30days;
|
Standard: JIS, GB, DIN, BS, ASTM, AISI;
Application: Loader, Construction Machinery, Metallurgical Machinery, Cement Plant, Mining Machine, Thermal Power Plant, Coal Yard;
Material: Chromium Carbide;
Type: Wear Resistant Plate;
Hardness: 58-63;
Grade: Q235/Q345+Chrome Carbide;
Product Name: Bimetal Concrete Pump Abrasion Steel Plate;
Base Material: Q235 or Q345;
Main Chemical Composition: Cr:22-32%;C:4-5%;
Wear Layer Thickness Error: +0.5/-0.5mm;
Delivery Time: 8-14 Days;
|
Standard: Qb;
Application: Conveyor Chutes;
Material: Alumina Ceramic, Natural Rubber, Neoprene;
Type: Wear Resistant Plate;
|
Standard: GB;
Application: Loader, Construction Machinery, Metallurgical Machinery, Cement Plant, Mining Machine, Thermal Power Plant, Coal Yard;
Material: High Alumina Ceramic Tiles, Zta, Rubber;
Type: Wear Resistant Ceramic Rubber Liner Plate;
Description: Iron Ore Mining Magnetic Ceramic Wear Liners;
Use: Wear and Impact Resistant Mateial;
Applications: Iron Ore Mine, Copper Mine, Coal Mine;
Use for: Feed Chute, Transfer Chute, Deflector Chute, etc.;
Ceramic Tiles: 92% or 95% Alumina or Zta Ceramic Tiles, etc;
Rubber: Natural Rubber;
Fixing Method: Bolt, Magnet, Bonding , Welding, etc.;
Custom: Custom-Made Ceramic Liners;
Samples: We Provide Samples to Evaluate The Properties.;
Polyurethane Ceramic Liners: Available;
Rubber Wear Liners: Available;
Polyurethane Lining Sheet: Available;
Quality: Proven Quality, High Wear Resistance;
Our Advantage: Manufacturer;
Lead Time: It Depends on The Sizes and Quantity;
|
Standard: JIS, GB, DIN, BS, ASTM;
Application: Loader, Construction Machinery, Metallurgical Machinery, Cement Plant, Mining Machine, Thermal Power Plant, Coal Yard;
Material: Steel;
Type: Wear Resistant Plate;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Alloy or Not: Non-Alloy;
Surface: Black Painting, Original Color, Per Request;
Advantages: High Wear and Impact Resistance;
Processing Temperature: 800-1500°;
Delivery Time: 15-21 Days;
MOQ: 1 Ton;
Price Term: CIF CFR Fob Ex-Work;
Inspection: The Third Party Inspection Is Accepted;
|