Specification |
Standard: JIS, GB, DIN, BS, ASTM, AISI, ISO9001:2000;
Application: Metallurgical Machinery, Cement Plant, Mining Machine, Thermal Power Plant, Coal Yard;
Material: Alumina Ceramic, Resilient Rubber,, Steel;
Type: Wear Resistant Ceramic;
Density: 1.4G/Cm3;
Tensile Strength at Beark: >14MPa;
Elongation at Break: >250%;
Shore Handness: 48-65;
Thermal Conductivity: 2W/M·K;
Adhesive Between Rubber&Ceramic: >3.5 MPa;
Shipping Way: Fob, CIF, DDP, DDU etc;
Aging Period: >1.5 Years;
Adhesive Between Tile and Rubber: >3.5 MPa;
Size: 300*300*64mm;
Sample Time: 3-5 Days;
Bulk Order Time: 10-30 Days;
Customized: Accept;
Key Words: Composite Ceramic Rubber Linings;
|
Standard: GB, ASTM, AISI, ISO;
Application: Loader, Construction Machinery, Metallurgical Machinery, Cement Plant, Mining Machine, Thermal Power Plant, Coal Yard, Coal Preparation Plant;
Material: Alumina Ceramic and Rubber;
Type: Wear Resistant Plate;
|
Standard: JIS, GB, DIN, BS, ASTM, AISI;
Application: Construction Machinery, Metallurgical Machinery, Cement Plant, Mining Machine, Thermal Power Plant;
Type: Wear Resistant Plate;
Surface Treatment: as Customer Required;
Sample: Support;
Thickness: 3-90mm or as Required;
MOQ: 1 Ton;
Test: BV-ISO-CE-SGS-Mtc;
Width: 2000mm 2200mm;
Length: 6000mm, 8000mm, 10000mm, 12000mm;
Advantage: Industry and Trade Integration;
|
Standard: GB;
Application: Loader, Construction Machinery, Metallurgical Machinery, Cement Plant, Mining Machine, Thermal Power Plant, Coal Yard;
Material: Stainless steel;
Type: Wear Resistant Pipe;
|
Standard: JIS, GB, DIN, BS, ASTM, AISI;
Application: Loader, Construction Machinery, Metallurgical Machinery, Cement Plant, Mining Machine, Thermal Power Plant, Coal Yard;
Type: Wear Resistant Plate;
Product Name: High Strength Abrasion Resistant Steel Plate;
Thickness: 6-100mm;
Width: 1000-2200mm or as Required;
Length: 1000-12000mm or as Required;
Payment: T/T, L/C, Credit Card;
MOQ: 1 Ton;
Service: Cutting as Customer Required;
Advantage: Top Quality, Lower Cost;
Delivery Time: 1 Ton: 5 Days, 100ton: 10 Days, 300ton:15 Days;
|