Specification |
Type: Coil;
Standard: AISI, ASTM, DIN, JIS, GB, BS;
Composition: Steel;
Technique: Cold Drawn;
Shape: U Channel;
Surface Treatment: Galvalume;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Application: Container Plate;
Term: Fob, EXW. CFR. CIF. CIP,Fca;
Payment: Tt,LC.Da.Dp;
Az Coating: 30-275g;
Coating: Galvanized/Galvalume;
|
Standard: GB;
Technique: Cold Rolled;
Surface Treatment: Galvanized;
Special Use: Mold Steel;
Application: Structural Steel Bar;
Length: 5800 etc;
|
Type: Strip/Coil;
Standard: AISI, ASTM, DIN, JIS, GB, BS;
Composition: Ferrous Steel Scrap;
Technique: Hot Rolled;
Shape: Strip/Coil;
Surface Treatment: Color Coated;
Special Use: High-strength Steel Plate, Wear Resistant Steel, Silicon Steel, Cold Heading Steel, Free Cutting Steel, Mold Steel;
Application: Structural Steel Bar;
Material: Steel, Q235 Q345;
Coil ID: ISO;
E.L.: 3%-5%;
Thickness: 0.20-2.0mm;
Name: Blue Painted Steel Strapping;
|
Type: Titanium Pipe/Tube;
Standard: AISI, ASTM, DIN, JIS, GB, BS, ASME etc;
Composition: Titanium/Titanium Alloy;
Technique: Welded/Seamless;
Shape: Round/Hollow;
Surface Treatment: Polished/Bright Annealing/Customized;
Special Use: High Corrosion Resistance;
Application: Oil/Gas/Power Plant/Water Resource/Aerospace/etc;
Thickness: 0.3~60mm/Customized;
Length: 3,6,9,12m/Customized;
Grade: Gr1, Gr2, Gr3, Gr5, Gr7, Gr9 etc/Customized;
Place of Origin: Wenzhou,Zhejiang;
Condition: Brand New;
Delivery Time: 7 to 30 Days After Payment;
|
Type: Titanium Pipe/Tube;
Standard: AISI, ASTM, DIN, JIS, GB, BS, ASME etc;
Composition: Titanium/Titanium Alloy;
Technique: Welded/Seamless;
Shape: Round/Hollow;
Surface Treatment: Polished/Bright Annealing/Customized;
Special Use: High Corrosion Resistance;
Application: Oil/Gas/Power Plant/Water Resource/Aerospace/etc;
Thickness: 0.3~60mm/Customized;
Length: 3,6,9,12m/Customized;
Grade: Gr1~Gr12/Customized;
Place of Origin: Wenzhou,Zhejiang;
Condition: Brand New;
Delivery Time: 7 to 30 Days After Payment;
|