Polyamide Cavity Production Tool

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Piece Negotiable

Sepcifications

  • Shaping Mode High Foaming Polystyrene Mould
  • Surface Finish Process Mirror Polishing
  • Mould Cavity Multi Cavity
  • Plastic Material PA
  • Runner Hot Runner
  • Design Software AutoCAD
  • Installation Mobile
  • Certification CE, ISO
  • Standard HASCO
  • Customized Customized
  • Transport Package Wooden Case
  • Trademark GY
  • Origin China

Product Description

Production Description Over the years, polyamide heat-insulation strip has been widely used in glass curtain walls due to its good properties and low cost. Especially Polyamide 66 reinforced by 25% glass fiber thermal break strips, they are inserted into aluminum window, door and facade profile for ...

Learn More

Nylon Insulating Strip Production Tool Comparison
Transaction Info
Price Negotiable US $ 20000/ Piece US $ 20000/ Piece US $ 25,000.00-30,000.00/ Set US $ 9,000.00-15,000.00/ Piece
Min Order 1 Pieces 1 Pieces 1 Pieces 1 Sets 1 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P T/T T/T T/T L/C, T/T
Quality Control
Product Certification CE, ISO ISO ISO ISO CE, ISO
Management System Certification ISO 9001 ISO 9000 ISO 9000 ISO 9000 ISO 9000
Trade Capacity
Export Markets Europe, Southeast Asia/ Mideast, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic North America, South America, Europe, Southeast Asia/ Mideast, Africa, East Asia(Japan/ South Korea), Australia, Domestic
Annual Export Revenue - - - - -
Business Model - - - - -
Average Lead Time - Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 3-6 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Shaping Mode: High Foaming Polystyrene Mould;
Surface Finish Process: Mirror Polishing;
Mould Cavity: Multi Cavity;
Plastic Material: PA;
Runner: Hot Runner;
Design Software: AutoCAD;
Installation: Mobile;
Standard: HASCO;
Customized: Customized;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Application: Car;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Product Material: PP;
Core&Cavity Steel: 718;
Steel Hardness: HRC 34-38;
Mould Standard: Dme,Hasco,Lkm;
Mould Base: S50c;
Quality Control: in House Professional QC;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP;
Application: Car;
Runner: Cold Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Product Material: PP;
Core&Cavity Steel: 718;
Steel Hardness: HRC 34-38;
Mould Standard: Dme,Hasco,Lkm;
Mould Base: S50c;
Quality Control: in House Professional QC;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: PP+GF;
Process Combination Type: Single-Process Mode;
Application: Car;
Runner: Hot Runner;
Design Software: UG;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Mould Name: Plastic Fan Shroud Mold;
Quality Control: in House Professional QC;
Mould Standard: Dme,Hasco,Lkm;
Mould Base: S50c;
Mould Type: Plastic Injection Mould;
Fob Port: Ningbo;
Shaping Mode: Injection Mould;
Surface Finish Process: Polishing;
Mould Cavity: Single Cavity;
Plastic Material: ABS;
Process Combination Type: Single-Process Mode;
Application: Household Appliances;
Runner: Hot Runner;
Design Software: Ug,PRO-E,Solidwork;
Installation: Fixed;
Standard: DME;
Customized: Customized;
Mould Base: S50c;
Runner System: Hot/Cold Runner;
Mould Cooling System: by Experienced Designer;
Mould Standard: Dme;
Heat Treatment: Nitriding, etc;
Mould Quality Control: Professional QC;
Mould Design Software: Ug, Proe, Solidworks CAD, Ect;
TV Size: All Part Size According to Customers Requirement;
Aftersale Service: Yes;
Mould Delivery Time: 40-60days;
Supplier Name

Zhangjiagang Guoyue Machinery Co., Ltd.

China Supplier - Gold Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Taizhou City Huangyan Beiwei Mould Industry Co., Ltd.

China Supplier - Diamond Member Audited Supplier