Table Formwork
US$55.00-101.00 / Square Meter
View
  • Recommend for you
  • What is China Steel Frame Panel Formwork for Wall and Column Construction
  • What is Steel Wood ISO Approved Zulin China Waffle Molds Concrete Bridge Dxb-180, 240
  • What is Steel Frame Panel Formwork for Wall and Column Construction with Good Price

What is High Quality Zulin Simple Structure Concrete Form Peri Floor Prop Slab Formwork

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

500 Square Meters US$55.00-101.00 / Square Meter

Sepcifications

  • After-sales Service Online Technical Support
  • Warranty 1 Year
  • Certification ISO
  • Material Steel Wood
  • Type Slab Formwork
  • Transport Package Package Box, Steel Pallet, Steel Frame, Container
  • Specification 2440*4880mm, 3300*5000mm
  • Trademark ZULIN
  • Origin China
  • Color Yellow, Blue or Customized
  • Length 3300~5000 mm
  • Width 2440~3600 mm
  • Thickness of Slab 100~500mm
  • Bearing Capacity 5~15kn/Square Meter
  • Auxiliary Equipment Lifting Fork, Shifting Trolley
  • Certificate SGS / ISO9001:2015
  • Application Slab Pouring

Product Description

Product Description ZULIN modular table formwork The flexible and adaptable slab formwork ...

Learn More

Table Formwork Comparison
Transaction Info
Price US $ 55.00-101.00/ Square Meter US $ 6.00-25.00/ Piece US $ 65.00-103.00/ Piece US $ 71.00-101.00/ Piece US $ 0.80-0.81/ Meter
Min Order 500 Square Meters 500 Pieces 10 Pieces 10 Pieces 10000 Meters
Payment Terms L/C, T/T L/C, T/T, Western Union L/C, T/T, D/P, Western Union, Paypal L/C, T/T, D/P, Western Union, Paypal T/T
Quality Control
Product Certification ISO ISO ISO ISO -
Management System Certification ISO 9001 ISO 9001 ISO 9001 ISO 9001 -
Trade Capacity
Export Markets Southeast Asia, Africa, Mid East North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Southeast Asia, Africa, Oceania, Mid East, Western Europe
Annual Export Revenue US$10 Million - US$50 Million US$10 Million - US$50 Million US$2.5 Million - US$5 Million US$2.5 Million - US$5 Million US$5 Million - US$10 Million
Business Model Own Brand(ZULIN) OEM, ODM, Own Brand(ZHIYI) OEM, ODM, Own Brand(DKS) OEM, ODM, Own Brand(DKS) OEM
Average Lead Time Off Season Lead Time: one month
Peak Season Lead Time: 1-3 months
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: one month
Peak Season Lead Time: one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Product Attributes
Specification
After-sales Service: Online Technical Support;
Warranty: 1 Year;
Material: Steel Wood;
Type: Slab Formwork;
Color: Yellow, Blue or Customized;
Length: 3300~5000 mm;
Width: 2440~3600 mm;
Thickness of Slab: 100~500mm;
Bearing Capacity: 5~15kn/Square Meter;
Auxiliary Equipment: Lifting Fork, Shifting Trolley;
Certificate: SGS / ISO9001:2015;
Application: Slab Pouring;
After-sales Service: Online Technical Support;
Warranty: None;
Material: Steel;
Type: Beam Formwork;
Adjustable Length: 600-6000mm;
Surface Treatment: Painted, Powder Coated, Electro Galvanized or HDG;
Color: as Your Required;
Prop Type: Cup Nut, Cast Nut;
Hscode: 7308400000;
Customization: Available;
Material Grade: Q195/Q235/Q345;
Usage: Building, Industrial;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
Function: Shoring System;
Usage: Building Material/Construction;
Formwork: Base Formwork/Climbing Formwork;
After-sales Service: Provide After Sale Service;
Warranty: Provide After Sale Service;
Material: Steel;
Type: Beam Formwork;
Steel: Q235/Q355;
Finished: HDG;
Delivery Term: 45 Days;
Container: FCL/LCL;
Function: Shoring System;
Usage: Building Material/Construction;
Formwork: Base Formwork/Climbing Formwork;
Material: Galvanized Plate;
Type: Wall Formwork;
Length: 2-4m;
Supplier Name

Beijing Zulin Formwork & Scaffolding Co., Ltd

Diamond Member Audited Supplier

TIANJIN ZHIYI METAL PRODUCTS CO., LTD

Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier

Taishan Dongkuo Steel Structure Co., Ltd.

Gold Member Audited Supplier

ANPING CHIYUN WIRE MESH MANUFACTURING CO., LTD

Gold Member Audited Supplier