Specification |
Color: Customized;
Application: Transportation Tools, Door & Window, Glass Wall, Heat Sink, Decorations;
Technique: as Required;
Grade: 5000 Series;
Temper: O - H112;
Surface Treatment: Mill Polished, Bright Hairline Sand Blast;
Alloy: Alloy;
Width: 20-2650mm;
Length: 500-16000mm;
Certificate: MTC, SGS, etc;
Delivery Time: 20 Days or as Requirement;
Trade Terms: FOB, CIF, CFR, etc;
Payment Term: 30% in Advance. Balance Before Shipment;
MOQ: 1PC for Stock, 6 Tons for Order;
Key Words: 5182 Aluminum Alloy Chemistry;
|
Application: Transportation Tools, Heat Sink, Decorations;
Technique: Hot Rolling;
Grade: 5000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Thickness: as Required;
Width: as Your Required;
Type: Aluminum Sheets;
Shape: Flat;
|
Application: Transportation Tools, Heat Sink, Decorations;
Technique: DC(Hot Rolling) and Cc(Cold Rolling);
Grade: 5000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish, Anodizing, Polish, Brush etc.;
Alloy: Alloy;
5052 Aluminum Sheet Color: Red, White, Black, Can Be as Customers' Request;
5052 Aluminum Sheet Thickness: 0.3-500mm;
5052 Aluminum Sheet Width: 200-3000mm;
5052 Aluminum Sheet Length: <12000;
Type: Aluminum Sheets;
Shape: Flat;
|
Application: Transportation Tools, Heat Sink, Decorations;
Technique: Hot Rolling;
Grade: 5000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish, Coated, Polished, Anodized, etc;
Alloy: Alloy;
Thickness: 0.2mm-500mm;
Width: 200mm-3000mm;
Place of Origin: Zhejiang, China (Mainland);
Brand Name: Hanlv;
Production Line: DC(Hot Rolling) or Cc(Cold Rolling);
Length: as The Customer Requires;
MOQ: 1 Ton;
Sea Port: Shanghai;
Date of Shipment: 20-30 Days After The Deposit;
Type: Aluminum Sheets;
Shape: Flat;
|
Color: Silver;
Application: Transportation Tools, Glass Wall, Heat Sink, Decorations;
Technique: Hot Rolling, Cold Rolling;
Grade: 3000 Series;
Temper: O - H112;
Surface Treatment: Mill Finish;
Alloy: Alloy;
Thickness: 0.2mm-500mm;
Width: 200mm-3000mm;
Place of Origin: Zhejiang, China (Mainland);
Brand Name: Hanlv;
Production Line: DC(Hot Rolling) or Cc(Cold Rolling);
Length: as The Customer's Requirements;
Sea Port: Shanghai or Ningbo;
Date of Shipment: 20-30 Days After The Deposit;
|