Specification |
Technics: Welding;
Standard: Non-GB;
Usage: Line Fittings, Connecting Cable;
Type: Terminal Clamp;
Single Gross Weight: 0.035kg;
Material: Copper/Aluminium;
Technique of Production: Friction Welding;
Surface Treatment: Smooth;
Application: Conduct Electricity, Transmission of Electrical Si;
Shape: Tube Type Current Conductor;
Interface Type: AC/DC;
ODM: Offered;
OEM: Offered;
|
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
|
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
|
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
|
Technics: Welding;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Section: L, U, I, H or Customized Welding Sections;
Surface: Hot DIP Galvanized More Than 85um(600g)/M2;
Unloading Idea: Each Pks Free Providing Two of Sling for Unloading;
Processing: Cutting, Punched Holes, Welding, Galvanize;
Other Providing: Supporting Parts Can Be Provided, Like Bolt &Nuts;
Drawing Time: Drawings Are Confirmed Within 3 Day;
Sample Time: Samples Are Confirmed Within 7 Days;
Produce Time: Goods Are Delivered Within 30 Days;
|