![Avatar](http://www.micstatic.com/athena/img/avatar-female.jpg)
Ms. Cathy
Sales Executive
Sales Department
Address:
No. 844 Honghe Road, North New Development Park, Rizhao, Shandong, China
Telephone:
Zip Code:
Fax:
Please sign in to view contact details |
Account Registered in:
2018
Business Range:
Construction & Decoration, Industrial Equipment & Components, Manufacturing & Processing Machinery
Business Type:
Manufacturer/Factory
Company Introduction
Production Capacity
Prima Formwork Co., Ltd dedicated to developing and supplying durable, safe and innovative formwork system and scaffolding components to countries all over the world. During the past 20 years, Prima has been continuously producing and supplying a wide range of scaffolding system as well as formwork accessories for the local market of Europe, Asia and north and south America as well as Africa and ...
Prima Formwork Co., Ltd dedicated to developing and supplying durable, safe and innovative formwork system and scaffolding components to countries all over the world. During the past 20 years, Prima has been continuously producing and supplying a wide range of scaffolding system as well as formwork accessories for the local market of Europe, Asia and north and south America as well as Africa and Middle Ease. Since the year 2012, we have transfered our main target from producing scaffolding as an OEM to supplying an innovative formwork system developed all by ourselves.
The main product we are currently producing is a Panel-Prop Earlu Stripping System named as GF formwork which was developed by our R&D department in Canada. It′s a fast and easy-handled system which saves machinery and labor cost as well. As an early-stripping formwork system with a joint connecting the panel and prop, GF formwork makes it possible to get the panel dismentled with the props supporting the concrete. Then the dismentled panels will be used for the next floor which will definitely improve the work efficiency at 30% compared with the tradtional formwork system. Meanwhile, the total panel amount is just 50% of the panel amount in traditional system which makes the machinery cost much lower. Generally, one full set of system can be reused for 50 times or more. Concerning the labor, a 3-4 workers team can finish the erecting of the system and the everage erecting area can reach to 100m2 per person per day.
During the last 5 years, this system has been widely applied in hundreds of construction projects in the USA, Canada, Czech Republic, U. A. E, Malaysia, Indonesia, Philippines, Thailand, Burma, Cambodia ect. For business expanding, we have spread our sales network to almost every continent including 6 branch companies in the USA, Australia, Sweden, Brazil, Burma and Cambodia and 3 foreign offices in France, Germany and Dubai.
The main product we are currently producing is a Panel-Prop Earlu Stripping System named as GF formwork which was developed by our R&D department in Canada. It′s a fast and easy-handled system which saves machinery and labor cost as well. As an early-stripping formwork system with a joint connecting the panel and prop, GF formwork makes it possible to get the panel dismentled with the props supporting the concrete. Then the dismentled panels will be used for the next floor which will definitely improve the work efficiency at 30% compared with the tradtional formwork system. Meanwhile, the total panel amount is just 50% of the panel amount in traditional system which makes the machinery cost much lower. Generally, one full set of system can be reused for 50 times or more. Concerning the labor, a 3-4 workers team can finish the erecting of the system and the everage erecting area can reach to 100m2 per person per day.
During the last 5 years, this system has been widely applied in hundreds of construction projects in the USA, Canada, Czech Republic, U. A. E, Malaysia, Indonesia, Philippines, Thailand, Burma, Cambodia ect. For business expanding, we have spread our sales network to almost every continent including 6 branch companies in the USA, Australia, Sweden, Brazil, Burma and Cambodia and 3 foreign offices in France, Germany and Dubai.
Factory Address:
No.844 Honghe road, north new development park
R&D Capacity:
OEM, Own Brand(GF formwork)
No. of R&D Staff:
11-20 People
No. of Production Lines:
10
Annual Output Value:
US$5 Million - US$10 Million