Specification |
Alloy: Non-alloy;
Technique: Hot Rolled;
Type: Equal;
Standard: GB;
Place of Origin: Jinan, Shandong;
Processing Service: Bending, Welding, Decoiling, Punching, Cutting;
Surface Finish: 2b;
Delivery Time: Within 7 Days;
Shape: C U Channel, Channel;
Material Grade: 201/202/304/304L/316/316L;
Thickness: 0.8mm - 25mm;
Grade: 300 Series;
|
After-sales Service: Available;
Warranty: 1 Year;
Technique: Hot Rolled;
Standard: GB, ASTM, JIS, AISI, DIN, BS;
Thickness: 0.5-20mm;
Stock: Large Quantity;
Length: 2-10m , or as Customer Request;
Delivery Time: 8-14 Days;
Shipment: Within 10-15 Workdays,25-30 Days When The Quantity;
|
After-sales Service: Available;
Warranty: 1 Year;
Technique: Hot Rolled;
Standard: GB, ASTM, JIS, AISI, DIN, BS;
Thickness: 0.5-20mm;
Stock: Large Quantity;
Length: 2-10m , or as Customer Request;
Delivery Time: 8-14 Days;
Shipment: Within 10-15 Workdays,25-30 Days When The Quantity;
|
After-sales Service: 7days;
Warranty: 7days;
Alloy: Steel;
Technique: Hot Rolled;
Type: Equal;
Shipping: Sea Freight;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Lead Time: 7 Days;
Length: Custom Cutting;
Material: Steel 235/355;
Application: Construction;
Surface: Galvanized Coated;
Zinc Coating: 40-275G/M2;
Delivery Time: Within 7 Days;
Edge: Mill Edge Slit Edge;
Sheet Grade: ASTM A572 Grade;
Place of Origin: Shandong, China;
Paint Kind: Rmp;
Invoicing: by Actual Weight;
Payment Term: L/C T/T;
|
After-sales Service: 7days;
Warranty: 7days;
Alloy: Steel;
Technique: Hot Rolled;
Type: Equal;
Shipping: Sea Freight;
Processing Service: Bending, Welding, Decoiling, Cutting, Punching;
Lead Time: 7 Days;
Length: Custom Cutting;
Material: Steel 235/355;
Application: Construction;
Surface: Galvanized Coated;
Zinc Coating: 40-275G/M2;
Delivery Time: Within 7 Days;
Edge: Mill Edge Slit Edge;
Sheet Grade: ASTM A572 Grade;
Place of Origin: Shandong, China;
Paint Kind: Rmp;
Invoicing: by Actual Weight;
Payment Term: L/C T/T;
|