Steel Unit Beam
US$10.00-50.00 / Piece
View
  • Recommend for you
  • What is Facade Scaffolding System--Double Guardrail (FAS-DT)
  • What is Adjustable Safety Rail Scaffolding Scaffold Framework Guardrail System Clamp for Edge Protection
  • What is Heavy Duty Steel Folding Scaffolding Trestle for Construction Use

What is Scaffolding System -Steel Unit Beam Ub/21

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$10.00-50.00 / Piece

Sepcifications

  • Material Metal
  • Type Steel Unit Beam
  • Transport Package Pallet
  • Trademark yueyang
  • Origin China
  • Size 6′/10′/13′/16′/20′/21′
  • Surface Paint/Electro- (Hot Dipped) Galvanized
  • Weight 21/34/44/54/67/70
  • Model Name Steel Unit Beam
  • Model No Ub/21
  • Certification CCC, CE, ISO
  • Surface Treatment Yes
  • Technics Casting

Product Description

Model No:UB/21 Model Name:Steel Unit Beam Features: 1.Material:Made of steel tube(Φ 48X3.25T) 2.Length(mm):6'/10'/13'/16'/20'/21' 3.Weight(kg):21/34/44/54/67/70 4.Surface:Paint/electro- (hot dipped) galvanized We could supply: 1.Scaffolding coupler (Drop forged or pressed) ...

Learn More

Steel Unit Beam Comparison
Transaction Info
Price US $ 10.00-50.00/ Piece US $ 15.00-25.00/ Set US $ 18.00-25.00/ Set US $ 7.02-8.50/ Set US $ 0.75-2.00/ Piece
Min Order 100 Pieces 50 Sets 200 Sets 100 Sets 1000 Pieces
Payment Terms L/C, T/T, Paypal T/T T/T T/T T/T, D/P, Paypal, Credit Card
Quality Control
Product Certification CCC, CE, ISO - - - CE/SGS
Management System Certification ISO 9001 - - - -
Trade Capacity
Export Markets - - - - North America, South America, Mid East, Eastern Asia
Annual Export Revenue US$2.5 Million - US$5 Million - - - US$50 Million - US$100 Million
Business Model OEM - - - OEM, ODM
Average Lead Time - - - - Off Season Lead Time: within 15 workdays
Peak Season Lead Time: one month
Product Attributes
Specification
Material: Metal;
Type: Steel Unit Beam;
Size: 6'/10'/13'/16'/20'/21';
Surface: Paint/Electro- (Hot Dipped) Galvanized;
Weight: 21/34/44/54/67/70;
Model Name: Steel Unit Beam;
Model No: Ub/21;
Surface Treatment: Yes;
Technics: Casting;
Connection Type: Clamp Connection;
Finish: Galvanized;
Material: Steel;
Type: Scaffold Planks;
Used: Work Platform or to Gain Extra Height;
Purpose: Climbing or Descending.;
Function: Support Construction Workers;
Materials: Aluminum , Fiber Glass;
Finish: Galvanized;
Material: Steel;
Type: Scaffold Frames;
Materials: Made of Steel;
Quality: Strong;
Design: Robust;
Durability: Long Lasting;
Capacity: High Load-Bearing;
Connection Type: Clamp Connection;
Finish: Galvanized;
Material: Steel;
Type: Scaffolding Support;
Used: Hold The Shape of The Concrete;
Purpose: to Apply Great Forces or Lift Heavy Loads;
Function: Temporary Structure to Support an Unsafe Structure;
Materials: Steel, Shore, a Timber or Metal Prop;
Connection Type: Clamp Connection;
Finish: Galvanized;
Material: Steel;
Color: Customization;
Surface Treatment: Galvanizd/Painted;
Packing: Bundle or Bulk as Required;
MOQ: 1000pieces;
Production Time: 7 Working Days;
Appication: Construction Buliding;
Model Number: Scaffolding Putlog Clamp;
Scaffolding Part Type: Scaffolding Couplers;
Style: Japanese. British, German, American;
Surface: Self-Color, Zinc Plated, Hot DIP Galvanized;
Supplier Name

Changzhou Yueyang Machinery Co., Ltd.

Diamond Member Audited Supplier

Jinan Fuyuan Grinding Materials Co., Ltd

Diamond Member Audited Supplier

Jinan Fuyuan Grinding Materials Co., Ltd

Diamond Member Audited Supplier

Jinan Fuyuan Grinding Materials Co., Ltd

Diamond Member Audited Supplier

Sichuan Taishenglan Technology Co., Ltd

Diamond Member Audited Supplier