Prefabricated Assembly Bailey Bridge Components Panel

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

10 Tons US$1,200.00-1,500.00 / Ton

Sepcifications

  • Certification ASTM
  • Life Temporary Bridge
  • Lane Position Deck Bridge
  • Material Steel Bridge
  • Transport Package Containers
  • Trademark Jiangsu Zhongye
  • Origin China

Product Description

Company Introduction Jiangsu Zhongye Traffic Engineering Co.,Ltd, funded in 2009,is a comprehensive heavy steel structure enterprise integrating design, R&D,manufacturing and project general contracting. We have set up branches in Beijing, Shanghai, Nanjing, Hangzhou, ...

Learn More

Bridge Components Panel Comparison
Transaction Info
Price US $ 1,200.00-1,500.00/ Ton US $ 900.00-1,500.00/ Ton US $ 900.00-1,500.00/ Ton US $ 900.00-1,500.00/ Ton US $ 900.00-1,500.00/ Ton
Min Order 10 Tons 1 Tons 1 Tons 1 Tons 1 Tons
Trade Terms - - - - -
Payment Terms T/T, Western Union L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification ASTM DIN, JIS, GB, BS, ASTM, AISI DIN, JIS, GB, BS, ASTM, AISI DIN, JIS, GB, BS, ASTM, AISI DIN, JIS, GB, BS, ASTM, AISI
Management System Certification - ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, HSE, QHSE ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, HSE, QHSE ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, HSE, QHSE ISO 9001, ISO 14001, OHSAS/ OHSMS 18001, HSE, QHSE
Trade Capacity
Export Markets - South America, Southeast Asia/ Mideast South America, Southeast Asia/ Mideast South America, Southeast Asia/ Mideast South America, Southeast Asia/ Mideast
Annual Export Revenue - - - - -
Business Model - OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Life: Temporary Bridge;
Lane Position: Deck Bridge;
Material: Steel Bridge;
After-sales Service: Guidance and Installation Services;
Warranty: 3 Years;
Life: Temporary Bridge;
Across Way: Fixed Bridge;
Lane Position: Down Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Truss Bridge;
Material: Steel Bridge;
Steel Grade: S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Loading Capacity: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Bolt: ISO898, AS/NZS1252, BS3692 or Equivalent;
Surface Paint: Long-Term Epoxy Zinc-Rich Kit or Temporary Alkyd K;
Welding Standard: Aws D1.1/Aws D1.5/AS/NZS 1554 or Equivalent;
After-sales Service: Guidance and Installation Services;
Warranty: 3 Years;
Life: Temporary Bridge;
Across Way: Fixed Bridge;
Lane Position: Down Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Truss Bridge;
Material: Steel Bridge;
Steel Grade: S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Loading Capacity: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Bolt: ISO898, AS/NZS1252, BS3692 or Equivalent;
Surface Paint: Long-Term Epoxy Zinc-Rich Kit or Temporary Alkyd K;
Welding Standard: Aws D1.1/Aws D1.5/AS/NZS 1554 or Equivalent;
After-sales Service: Guidance and Installation Services;
Warranty: 3 Years;
Life: Temporary Bridge;
Across Way: Fixed Bridge;
Lane Position: Down Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Truss Bridge;
Material: Steel Bridge;
Steel Grade: S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Loading Capacity: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Bolt: ISO898, AS/NZS1252, BS3692 or Equivalent;
Surface Paint: Long-Term Epoxy Zinc-Rich Kit or Temporary Alkyd K;
Welding Standard: Aws D1.1/Aws D1.5/AS/NZS 1554 or Equivalent;
After-sales Service: Guidance and Installation Services;
Warranty: 3 Years;
Life: Temporary Bridge;
Across Way: Fixed Bridge;
Lane Position: Down Through Bridge;
Usage: Over Water Bridge, Tractor Bridge, Pontoon, Footbridge, Public Iron Dual Purpose Bridge, Highway Bridge;
Scale: Middle Bridge;
Stress Characteristics: Truss Bridge;
Material: Steel Bridge;
Steel Grade: S355/ S460/Gr 55c/Gr350/Gr50/Gr65/GB355/460;
Loading Capacity: Hl93/Ha+20hb/T44/Class a/B/MLC110/dB24;
Bridge Deck Net Width: 4m/ 4.2m;
Maximum Free Span Length: 51m =170FT;
International Panel Dimension: 3048mm*1450mm(Holes Center Distance);
Supplier Name

Jiangsu Zhongye Traffic Engineering Co., Ltd.

China Supplier - Gold Member Audited Supplier

Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Zhenjiang Great Wall Heavy Industry Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier