Specification |
Type: Copper Pipe;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM,DIN,En,ISO,JIS,GB;
Process: Punching, Cutting;
MOQ: 1 Ton;
Copper Content: 99.9%;
Sample: Provided Freely Sample;
Delivery Time: 7-15 Days;
Price Term: CIF CFR Fob Ex-Work;
Payment Term: L/C Tt 30% Deposite;
|
Type: Copper Bars;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Rod/Bar;
Diameter: 3-800mm;
Length: 1-12m, or as Request;
Model Number: T2, T3, Tp1, Tp2, Tu1, Tu2,H96, H80,etc;
Other Shape: Square Rods, Wires, Plates, Flat Bars;
MOQ: 300kg;
Delivery Time: 15-21 Days;
|
Type: Copper Bars;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Rod/Bar;
Diameter: 3-800mm;
Length: 1-12m, or as Request;
Model Number: T2, T3, Tp1, Tp2, Tu1, Tu2,H96, H80,etc;
Other Shape: Square Rods, Wires, Plates, Flat Bars;
MOQ: 300kg;
Delivery Time: 15-21 Days;
|
Type: Copper Bars;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Rod/Bar;
Diameter: 3-800mm;
Length: 1-12m, or as Request;
Model Number: T2, T3, Tp1, Tp2, Tu1, Tu2,H96, H80,etc;
Other Shape: Square Rods, Wires, Plates, Flat Bars;
MOQ: 300kg;
Delivery Time: 15-21 Days;
|
Type: Copper Bars;
Application: Air Condition or Refrigerator, Water Tube, Water Heater, Oil Cooler Pipe;
Material: Red Copper;
Shape: Round;
Alloy: Non-alloy;
Color: Red;
Standard: ASTM;
Product Name: Copper Rod/Bar;
Diameter: 3-800mm;
Length: 1-12m, or as Request;
Model Number: T2, T3, Tp1, Tp2, Tu1, Tu2,H96, H80,etc;
Other Shape: Square Rods, Wires, Plates, Flat Bars;
MOQ: 300kg;
Delivery Time: 15-21 Days;
|