Specification |
Casting Method: Directional Crystallization;
Process: Lost Wax Casting;
Molding Technics: Gravity Casting;
Application: Machinery Parts;
Material: Steel/Stainless Steel/Alloy Steel/Carbon Steel;
Surface Preparation: Anpolishing/Zinc Plated/CNC Machining;
Surface Roughness: Ra1.6;
Machining Tolerance: +/-0.02mm;
Standard: ASTM;
Service: Metal Parts Solution as Customer's Drawing/Design;
Metal Parts Solution as Customer's Drawi: Within 35-50 Days Depends on Parts;
Shipping Method: by Sea or by Air;
Drawing Format: Pdf, Dwg, CAD, Dxf, Step, Igs etc.;
Quality Control: 100% QC Inspection;
Heat Treatment: Annealing, Normalizing, Hardening, Tempering, Case;
Weight/Size: Customizable;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Investment Casting;
Molding Technics: Lost Wax Molding Plus Pouring;
Application: Vehicle, Agriculture Machine, Construction Machine;
Material: Steel;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra0.8-3.2;
Machining Tolerance: 0.005mm-0.01mm;
Standard: as Customer Request;
Item Name: Foundry Casting Carbon Lost Wax Casting Steel Pipe;
Material Available: G25crmo4, G35, Wcb;
Blank Process: Investment Casting, Option Lost Wax Casting;
Casting Tolerance: CT6-8 for Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
MOQ: 200kg for Bearing Sleeve;
Lead Time: 60 Days for Investment Casting;
Service: Custom Parts Based on Drawing or Sample;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Lost Wax Casting;
Molding Technics: Lost Wax Molding Plus Pouring;
Application: Vehicle, Agriculture Machine, Construction Machine;
Material: Stainless Steel;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra0.8-3.2;
Machining Tolerance: 0.005mm-0.01mm;
Item Name: Casting Centrifugal Pump Stainless Steel Impeller;
Casting Material: Stainless Steel 316, Option 304, CF8m;
Blank Process: Investment Casting or Lost Wax Casting;
Casting Tolerance: CT4-8 for Stainless Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
Surface Treatment: Dacromat Coating, Finish Painting;
Package: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Pump Impeller;
Service: Custom Parts Based on Drawing or Sample;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Lost Wax Casting;
Molding Technics: Lost Wax Molding Plus Pouring;
Application: Vehicle, Agriculture Machine, Construction Machine;
Material: Stainless Steel;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra0.8-3.2;
Machining Tolerance: 0.005mm-0.01mm;
Item Name: Precision Flange Tube Stainless Steel Casting Part;
Casting Material: Stainless Steel 316, Option 304, CF8m;
Blank Process: Investment Casting or Lost Wax Casting;
Casting Tolerance: CT4-8 for Stainless Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
Surface Treatment: Dacromat Coating, Finish Painting;
Package: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Stainless Steel Casting Parts;
Service: Custom Parts Based on Drawing or Sample;
|
Casting Method: Mechanical Aided Pouring& Semi-Automatic Pouring;
Process: Investment Casting;
Molding Technics: Investment Casting, Lost Wax Casting;
Application: Vehicle, Agriculture Machine, Construction Machine;
Material: Stainless Steel 304, 316, etc;
Surface Preparation: Dacromat Coating, Finish Painting;
Surface Roughness: Ra6.3~12.5;
Machining Tolerance: ISO 2768-M;
Standard: ASTM/AISI/JIS/DIN etc;
Item Name: Metal Small Parts Stainless Steel Lost Wax Casting;
Casting Material: Stainless Steel 316, Option 304, CF8m;
Blank Process: Investment Casting or Lost Wax Casting;
Casting Tolerance: CT4-8 for Stainless Steel Casting;
Machining Process: CNC Machining/ Lathing/ Milling/ Turning/ Boring/;
Machining Tolearnce: up to It7, Ra 0.8~3.2;
Surface Treatment: Dacromat Coating, Finish Painting;
Package: Multiplayer Wood Box with Big Plastic Bag Inside;
Lead Time: 45 Days for Stainless Steel Small Parts;
Service: Custom Parts Based on Drawing or Sample;
|