Specification |
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Forging;
Application: Automobile, Machinery, Gas and Oil etc.;
Material: Aluminum/Steel etc.;
Heat Treatment: Quenching/Annealing/Tempring/Normalizing;
Surface Treatment: Sand Blast/Powder Coating/Electroplating/Polishing;
Forging Tolerance: +/-0.1mm;
Standard: AISI;
Drawing Format: Step, STP, Pdf, Dwg, Dxf, etc;
Factory Location: Ningbo;
Technical Support: R&D, Before and After Sales Service;
|
Processing Object: Nickel Alloy;
Molding Style: Forging;
Molding Technics: Forgings;
Application: Machinery Parts;
Material: Nickel Alloy;
Heat Treatment: Quenching;
Surface Treatment: Polishing;
Forging Tolerance: +/-0.1mm;
Standard: AISI;
Form: Ring, Shaft, Roller, Block, Disc, Plate, Cylinder,;
Process: Hot Forged;
Heat: Annealed, Normalized, Solution, Vacuum;
Surface: Grounded, Turning, Polished, Milling, Borehole;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Open-Die Forging;
Application: Machinery Parts;
Material: Carbon Steel;
Heat Treatment: Normalizing;
Surface Treatment: Polishing;
Forging Tolerance: +/-0.5mm;
Standard: ASTM;
Standards: ASTM a 370, API 16A;
Testing Report: Mtc, Ht, Dimension Report, En3.1;
Stamping: Available;
Lead Time: 10-25 Working Days;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Gravity Casting;
Application: Machinery Parts;
Material: Steel;
Heat Treatment: Normalizing;
Surface Treatment: Polishing;
Forging Tolerance: +/-0.2mm;
Standard: ASTM;
Standand: ASTM A370, API 16A;
Testing Report: Mtc, Ht, Dimension Report, En 10204 ,3.1;
Materials: Carbon Steel, Stainless Steel, Alloy Steel;
Lead Time: 10-25 Working Days;
|
Processing Object: Metal;
Molding Style: Forging;
Molding Technics: Open-Die Forging;
Application: Machinery Parts;
Material: Steel;
Heat Treatment: Quenching;
Surface Treatment: Polishing;
Forging Tolerance: +/-0.5mm;
Standard: ASME;
Materials: CS, Ss, Dss, Alloy Steel;
Certificates: Ht, Mtc, En3.1, Co, etc..;
Color: Metal Color, Black or Golden or as Requested;
Lead Time: 10-25days;
|