Double-End Insulated Rod
US$12.00-15.00 / Piece
View
  • Recommend for you
  • What is Rail Screw Spike for Wooden or Concrete Sleeper Railway Fastener
  • What is T89 T75 T5a T45 Lift Elevator Guide Rail Clips
  • What is Elastic Rail Fastening Railway Clips China Supplier

What is High Quality Track Materials Railway Gauge Rod

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

100-199 Pieces US$15.00

200-299 Pieces US$14.00

300+ Pieces US$12.00

Sepcifications

  • Customized Customized
  • Certification ISO14001, ISO9001
  • Type Tie Plate
  • Transport Package Wooden Box/Pallet
  • Specification Railway Track Gauge Rod
  • Trademark Kingrail Parts
  • Origin China
  • Item Railway Insulated Gauge Tie Rod
  • Adjustable Parts Adjustable Parts: Head
  • Application Railway Track Maintenance and Construction
  • Length 1750mm
  • Components 1PCS Rod 4PCS Iron Card 4PCS Flat Washer 4PCS Nuts
  • Dimensions (L x W x H) (mm) H) (mm): Custumers′ Requirements

Product Description

Rail gauge rod, also named gauge tie rod or gauge tie bar, is a member bar which is specially designed to joint two steel rails at the rail bottom to protect the rails from tilting and keep the rails in certain rail gauge. Rail gauge rod with a rod in the bottom of the two rails of the rail link, ...

Learn More

Double-End Insulated Rod Comparison
Transaction Info
Price US $ 12.00-15.00/ Piece US $ 1650/ Piece US $ 1650/ Piece US $ 1650/ Piece US $ 0.80-6.00/ Piece
Min Order 100 Pieces 1 Pieces 1 Pieces 1 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, Paypal L/C, T/T, Paypal L/C, T/T, Paypal L/C, T/T
Quality Control
Product Certification ISO14001, ISO9001 ISO9001 ISO9001 ISO9001 CE
Management System Certification ISO 9001, ISO 9000 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe Eastern Europe, Southeast Asia, Africa, Western Europe Eastern Europe, Southeast Asia, Africa, Western Europe Eastern Europe, Southeast Asia, Africa, Western Europe North America, South America, Southeast Asia, Oceania, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: 1-3 Month(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Product Attributes
Specification
Customized: Customized;
Type: Tie Plate;
Item: Railway Insulated Gauge Tie Rod;
Adjustable Parts: Adjustable Parts: Head;
Application: Railway Track Maintenance and Construction;
Length: 1750mm;
Components: 1PCS Rod 4PCS Iron Card 4PCS Flat Washer 4PCS Nuts;
Dimensions (L x W x H) (mm): H) (mm): Custumers' Requirements;
After-sales Service: Yes;
Warranty: 1 Year;
Customized: Customized;
Type: Track Measurement;
Material: Aumunium;
Measure Range: ±1:10 ~ ±1:200;
Power: 40mA;
Power Supply Mode: Built-in Lithium Battery Charging;
Size: 225*90*60mm;
Working Temperature: -30°~ +60°;
After-sales Service: Yes;
Warranty: 1 Year;
Customized: Customized;
Type: Track Measurement;
Material: Aumunium;
Measure Range: ±1:10 ~ ±1:200;
Power: 40mA;
Power Supply Mode: Built-in Lithium Battery Charging;
Size: 225*90*60mm;
Working Temperature: -30°~ +60°;
After-sales Service: Yes;
Warranty: 1 Year;
Customized: Customized;
Type: Track Measurement;
Material: Aumunium;
Measure Range: ±1:10 ~ ±1:200;
Power: 40mA;
Power Supply Mode: Built-in Lithium Battery Charging;
Size: 225*90*60mm;
Working Temperature: -30°~ +60°;
After-sales Service: Returns and Exchanges;
Warranty: 5 Year;
Customized: Customized;
Type: Clip;
Application: Railway Fastening;
Standard: Welded/Bolted Crane Rail Clip;
Surface Finishing: Plain,Zinc,Nickel,Black Zinc,HDG;
Design and Produce: Available;
Sample: in Stock;
Delivery Time: 15 to 30 Days;
Quality Control: 100% Inspection During Production;
Supplier Name

Maanshan Kingrail Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

WUHAN LINKAGE TRACK EQUIPMENT CO., LTD.

China Supplier - Gold Member Audited Supplier

WUHAN LINKAGE TRACK EQUIPMENT CO., LTD.

China Supplier - Gold Member Audited Supplier

WUHAN LINKAGE TRACK EQUIPMENT CO., LTD.

China Supplier - Gold Member Audited Supplier

Kunshan Signum Machinery Technology Co., Ltd.

China Supplier - Gold Member Audited Supplier