Electroplating Power Rectifier High Frequency Electroplating Rectifier

About this Item
Details
Company Profile

Price

Purchase Qty. Reference FOB Price

1-9 Meters US$306.27

10+ Meters US$3,062.00

Sepcifications

  • Output Voltage 12V
  • Transport Package Carton
  • Trademark YUNSHI
  • Origin China

Product Description

Model Cooling way Weight Size (cm) MK-20A 24V Air cooling 3.5kg 23*28*10cm MK-300A12V/15V/18V Air cooling 25kg 58*46*20cm MK-500A12V/15V/18V Air cooling 25kg 58*46*20cm MK-1000A12V/15V/18V Air cooling 34kg 73*50*28cm MK-1500A12V/15V/18V Air cooling 74kg 75*56*28cm ...

Learn More

Rectifier Machine Comparison
Transaction Info
Price US$306.27 - 3,062.00 / Meter US$4,600.00 - 8,500.00 / Piece US$4,600.00 - 8,500.00 / Piece US$4,600.00 - 8,500.00 / Piece US$4,600.00 - 8,500.00 / Piece
Min Order 1 Meter 1 Piece 1 Piece 1 Piece 1 Piece
Payment Terms LC, T/T, D/P, PayPal, Western Union, Small-amount payment T/T, Western Union, PayPal, LC, D/P T/T, Western Union, PayPal, LC, D/P T/T, Western Union, PayPal, LC, D/P T/T, Western Union, PayPal, LC, D/P
Quality Control
Product Certification - ISO9001 ISO9001 ISO9001 ISO9001
Management System Certification - ISO9001:2015 ISO9001:2015 ISO9001:2015 ISO9001:2015
Trade Capacity
Export Markets North America, South America, Europe, Southeast Asia/ Mideast, Africa, Domestic Domestic Domestic Domestic Domestic
Annual Export Revenue - - - - -
Business Model ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM Own Brand, ODM, OEM
Average Lead Time Peak Season Lead Time: within 15 workdays
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays
Peak Season Lead Time: within 15 workdays, one month
Off Season Lead Time: within 15 workdays
Product Attributes
Specification
Output Voltage: 12V;
Cooling Method: Water Cooling;
Input Voltage: 380V;
Output Frequency: 50Hz;
Output Voltage: 12V;
After-sales Service: 1 Year Warranty;
Switch Tube Type: IGBT;
Output: Customer′s Requests;
Cooling Mode: Water-Cooling;
Ambient Temperature: 0ºC--40ºC;
Delivery Date: Within 20 Days After Deposit;
Cooling Method: Water Cooling;
Input Voltage: 380V;
Output Frequency: 50Hz;
Output Voltage: 12V;
After-sales Service: 1 Year Warranty;
Switch Tube Type: IGBT;
Output: Customer′s Requests;
Cooling Mode: Water-Cooling;
Ambient Temperature: 0ºC--40ºC;
Delivery Date: Within 20 Days After Deposit;
Cooling Method: Water Cooling;
Input Voltage: 380V;
Output Frequency: 50Hz;
Output Voltage: 12V;
After-sales Service: 1 Year Warranty;
Switch Tube Type: IGBT;
Output: 60000A;
Cooling Mode: Water-Cooling;
Ambient Temperature: 0ºC--40ºC;
Delivery Date: Within 20 Days After Deposit;
Cooling Method: Water Cooling;
Input Voltage: 380V;
Output Frequency: 50Hz;
Output Voltage: 12V;
After-sales Service: 1 Year Warranty;
Switch Tube Type: IGBT;
Output: 16000A;
Cooling Mode: Water-Cooling;
Ambient Temperature: 0ºC--40ºC;
Delivery Date: Within 20 Days After Deposit;
Supplier Name

Langfang Yunshi Environmental Protechnology Co., Ltd.

Diamond Member Audited Supplier

Foshan Lihao Power Technology Co., Ltd.

Diamond Member Audited Supplier

Foshan Lihao Power Technology Co., Ltd.

Diamond Member Audited Supplier

Foshan Lihao Power Technology Co., Ltd.

Diamond Member Audited Supplier

Foshan Lihao Power Technology Co., Ltd.

Diamond Member Audited Supplier