Pole Line Hardware Forged Thimble Eye Bolt Hot DIP Galvanized ASTM A153

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

500 Pieces US$1.00-2.00 / Piece

Sepcifications

  • Technics Cold Pressing
  • Standard GB
  • Usage Line Fittings
  • Type Pull-Line Fitting
  • Transport Package Exportation Standard Package
  • Specification customization
  • Trademark winner
  • Origin China
  • Lead Time 30 Days
  • Surface Treatment HDG
  • Color Silver
  • Material Steel

Product Description

Pole Line Hardware Forged Thimble Eye Bolt Hot Dip Galvanized ASTM A153 Product Description RE Thimble Eye Bolts are forged from rolled bars open hearth carbon steel with the same strength of machine bolt manufactured in accordance with ANSl standards.C 135.1-79.Eye dimenslon is the same as shown ...

Learn More

Electric Power Fitting Comparison
Transaction Info
Price US $ 1.00-2.00/ Piece US $ 2.00-3.00/ Piece Negotiable Negotiable Negotiable
Min Order 500 Pieces 1000 Pieces 1000 Pieces 1000 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal L/C, T/T, Western Union, Paypal
Quality Control
Management System Certification ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, OHSAS/ OHSMS 18001, IATF16949, HSE, ISO 14064, QC 080000, GMP, BSCI - ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets - North America, South America, Southeast Asia/ Mideast North America, Europe, Africa North America, Europe, Africa North America, Europe, Africa
Annual Export Revenue - > US $100 Million - - -
Business Model - Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time - Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
Technics: Cold Pressing;
Standard: GB;
Usage: Line Fittings;
Type: Pull-Line Fitting;
Lead Time: 30 Days;
Surface Treatment: HDG;
Color: Silver;
Material: Steel;
Technics: Injection Molding;
Standard: Non-GB;
Type: Pull-Line Fitting;
Length: 6-12;
Technics: H.D.G.;
Standard: GB;
Usage: Substation Fittings, Line Fittings, Cable Accessory;
Type: Link Fittings;
Material: Steel;
Surface: Hot-DIP Galvanized;
Technics: H.D.G.;
Standard: GB;
Usage: Substation Fittings, Line Fittings, Cable Accessory;
Type: Link Fittings;
Material: Steel;
Surface: Hot-DIP Galvanized;
Technics: H.D.G.;
Standard: GB;
Usage: Substation Fittings, Line Fittings, Cable Accessory;
Type: Link Fittings;
Material: Steel;
Surface: Hot-DIP Galvanized;
Supplier Name

Beijing Winner Electric Power Energy Co., Ltd

China Supplier - Diamond Member Audited Supplier

Victory Electric Power Equipment Co., Ltd.

China Supplier - Gold Member Audited Supplier

ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.

China Supplier - Diamond Member Audited Supplier

ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.

China Supplier - Diamond Member Audited Supplier

ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.

China Supplier - Diamond Member Audited Supplier