Sheet Metal Fabrication Custom Metal Parts

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$1.00-5.00 / Piece

Sepcifications

  • Tolerance +/-0.10mm
  • Surface Treatment Powder Coated
  • Machining Method CNC Machining
  • Material Iron, Stainless Steel, etc
  • Transport Package Plastic Bag + Polyfoam + Standard Carton
  • Specification Customized
  • Trademark YISHANG
  • Origin China(Mainland) Guangdong
  • Service OEM Support
  • Type OEM Parts
  • Thickness 0.8 - 3.0 mm
  • Payment Method T/T, Western Union, Cash

Product Description

Yishang specialize in custom metal fabrication since 1996. Including large part of industries such as display stands, window and door frames, electric cases, accurate electronic boxes, control panel, light boxes, server rack and other small &large metal working parts. With quality assurance and ...

Learn More

Sheet Metal Fabrication Comparison
Transaction Info
Price US $ 1.00-5.00/ Piece US $ 1.30-2.08/ Piece US $ 1.30-2.08/ Piece US $ 1.30-2.08/ Piece US $ 0.11-0.25/ Piece
Min Order 100 Pieces 500 Pieces 500 Pieces 500 Pieces 1000 Pieces
Trade Terms - - - - -
Payment Terms T/T, Western Union, Money Gram L/C, T/T, D/P L/C, T/T, D/P L/C, T/T, D/P L/C, T/T, Paypal
Quality Control
Management System Certification ISO 9001 - - - ISO 9001
Trade Capacity
Export Markets North America, Europe, Southeast Asia/ Mideast North America, South America, Eastern Europe, Southeast Asia, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Product Attributes
Specification
Tolerance: +/-0.10mm;
Surface Treatment: Powder Coated;
Machining Method: CNC Machining;
Material: Iron, Stainless Steel, etc;
Service: OEM Support;
Type: OEM Parts;
Thickness: 0.8 - 3.0 mm;
Payment Method: T/T, Western Union, Cash;
Standard: GB, EN, China GB Code, JIS Code, ASME;
Tolerance: +/-0.01mm;
Surface Treatment: Powder Coating,Galvanized,Anodizing,E-Coating;
Machining Method: Stamping,Punching,Bending,Forming,Laser Cutting;
Material: Ss,Spgc,Secc,SGCC,Aluminum,Brass,;
Material Thickness: 0.1-20mm;
Quality Control: Control Plan,Cpk,Flow Chart,Pfema;
Advantage: Precise Stamping Parts;
Other Process: Welding,Deep Drawing,Spinning,Pipe C;
Inspection: Isir, in-Process, Final Inspection;
Inspection Tools: CMM, Gauges, Indicators, Projector;
Standard: GB, EN, China GB Code, JIS Code, ASME;
Tolerance: +/-0.01mm;
Surface Treatment: Powder Coating,Galvanized,Anodizing,E-Coating;
Machining Method: Stamping,Punching,Bending,Forming,Laser Cutting;
Material: Ss,Spgc,Secc,SGCC,Aluminum,Brass,;
Material Thickness: 0.1-20mm;
Quality Control: Control Plan,Cpk,Flow Chart,Pfema;
Advantage: Precise Stamping Parts;
Other Process: Welding,Deep Drawing,Spinning,Pipe Cutting;
Standard: GB, EN, China GB Code, JIS Code, ASME;
Tolerance: +/-0.01mm;
Surface Treatment: Powder Coating,Galvanized,Anodizing,E-Coating;
Machining Method: Stamping,Punching,Bending,Forming,Laser Cutting;
Material: Ss,Spgc,Secc,SGCC,Aluminum,Brass,;
Material Thickness: 0.1-20mm;
Quality Control: Control Plan,Cpk,Flow Chart,Pfema;
Advantage: Precise Stamping Parts;
Inspection Tools: CMM, Gauges, Indicators, Projector;
Inspection: Isir, in-Process, Final Inspection;
Other Process: Welding,Deep Drawing,Spinning,Pipe Cutting;
Standard: GB;
Tolerance: +/-0.10mm;
Surface Treatment: Polishing;
Machining Method: Stamping;
Material: Stainless Steel;
Color: Customization;
Usage: Auto Industry, Furniture Industry etc;
Stamping Experience: More Than 20 Years;
Payment Term: 50% Deposit;
Express Shipping: DHL, FedEx, TNT, UPS Tec.;
Air Shipping: DDP, etc;
Sea Shipping: DDP, etc;
Trade Terms: DAP, DDP, EXW, Fob, CIF, CFR etc.;
Supplier Name

Zhongshan Yishang Metal Manufacturing Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Qingdao ACES Machinery Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Qingdao ACES Machinery Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Qingdao ACES Machinery Technology Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Nanpi Xinjiuxinji Hardware Manufacturing Co., Ltd.

China Supplier - Diamond Member Audited Supplier