Steel Pipe
US$599.00-669.00 / Ton
View
  • Recommend for you
  • How to Make Tianjin Yuantai Welded Pipe Steel Tubes Pipes Suppliers Hot Galvanized Round Steel Round Pipe
  • How to Make ASTM a 500 Gr a High Quality Galvanized Round Steel Pipe &HDG Tube Gi Hollow Section for Building
  • How to Make Q235 Ss400 S235jr Straight Shs Iron Metal Tube Steel Profiles Seam Submerged Arc Welded Steel Pipe Rectangular Steel Tube 500*1100*11.5~50.0

How to Make Steel Scaffold Tube ERW Welded Steel Pipes Manufactures Pre Galvanized 1/2 Inch Structural Hollow Pipe Rectangular Steel Pipe 80*100*1.5~8

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

1 Ton US$599.00-669.00 / Ton

Sepcifications

  • After-sales Service Support
  • Warranty One Year
  • Type Welded
  • Technique Hot Rolled
  • Material Carbon Steel
  • Surface Treatment Galvanized
  • Usage Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
  • Section Shape Square and Rectangulatr
  • Specification 80*100*1.7
  • Trademark Yuantai Derun
  • Origin Tianjin, China
  • Thickness 0.5-60mm
  • Length 3-12m According to Client Requirement
  • Od-Square 10*10mm-1000*1000mm
  • Od-Rectangular 10*15mm-800*1100mm
  • Od-Round 10.3mm-609mm
  • Technology ERW, LSAW, SSAW, Seamless
  • Delivery Time 7-30 Days
  • Materials Gr.a/B/C, S235/275/355/420/460, A36, Ss400
  • Standards Hollow Section:ASTM A500/A501, En10219/10210
  • Oiled or Non-Oiled Non-Oiled
  • Alloy or Not Non-Alloy
  • Processing Service Welding, Punching, Cutting, Bending, Decoiling
  • Certification CE, LEED, BV, Phd&EPD, Bc1, En10210, En10219

Product Description

Our Adavantage: √ Quick reply within 24 hours. √ Large Stock for regular sizes. √ Free sample high quality. √ 100% after-sales quality and quantity assurance. Product Parameters O.D mm W.T mm O.D mm W.T mm O.D mm W.T mm O.D mm W.T mm 20*20 1.3 60*120 ...

Learn More

Steel Pipe Comparison
Transaction Info
Price US $ 599.00-669.00/ Ton US $ 2,400.00-2,600.00/ Ton US $ 2,400.00-2,600.00/ Ton US $ 2,400.00-2,600.00/ Ton US $ 2,400.00-2,600.00/ Ton
Min Order 1 Tons 1 Tons 1 Tons 1 Tons 1 Tons
Trade Terms - - - - -
Payment Terms L/C, T/T L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Product Certification CE, LEED, BV, Phd&EPD, Bc1, En10210, En10219 - - - -
Management System Certification ISO 9001, ISO 9000, ISO 14001, OHSAS/ OHSMS 18001 - - - -
Trade Capacity
Export Markets North America, Others North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe
Annual Export Revenue - - - - -
Business Model Own Brand OEM, ODM OEM, ODM OEM, ODM OEM, ODM
Average Lead Time Off-season: within 15 Day(s)
Peak-season: 1 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
After-sales Service: Support;
Warranty: One Year;
Type: Welded;
Technique: Hot Rolled;
Material: Carbon Steel;
Surface Treatment: Galvanized;
Usage: Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Square and Rectangulatr;
Thickness: 0.5-60mm;
Length: 3-12m According to Client Requirement;
Od-Square: 10*10mm-1000*1000mm;
Od-Rectangular: 10*15mm-800*1100mm;
Od-Round: 10.3mm-609mm;
Technology: ERW, LSAW, SSAW, Seamless;
Delivery Time: 7-30 Days;
Materials: Gr.a/B/C, S235/275/355/420/460, A36, Ss400;
Standards: Hollow Section:ASTM A500/A501, En10219/10210;
Oiled or Non-Oiled: Non-Oiled;
Alloy or Not: Non-Alloy;
Processing Service: Welding, Punching, Cutting, Bending, Decoiling;
Type: Seamless;
Technique: Cold Rolled;
Material: Stainless Steel;
Surface Treatment: Polished;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Type: Seamless;
Technique: Cold Rolled;
Material: Stainless Steel;
Surface Treatment: Polished;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Type: Seamless;
Technique: Cold Rolled;
Material: Stainless Steel;
Surface Treatment: Polished;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Type: Seamless;
Technique: Cold Rolled;
Material: Stainless Steel;
Surface Treatment: Polished;
Usage: Pipeline Transport, Boiler Pipe, Oil/Gas Drilling, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose;
Section Shape: Round;
Supplier Name

Tianjin Yuantai Derun Steel Pipe Manufacturing Group Co., Ltd.

China Supplier - Gold Member Audited Supplier

Shanghai Bozhong Metal Group Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shanghai Bozhong Metal Group Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shanghai Bozhong Metal Group Co., Ltd.

China Supplier - Diamond Member Audited Supplier

Shanghai Bozhong Metal Group Co., Ltd.

China Supplier - Diamond Member Audited Supplier