Specification |
Condition: New;
Standard: DIN, ASTM, GB, JIS, ANSI;
Customized: Customized;
Material: Aluminum;
Surface Finishes: Anodizing, Polished, Powder Coating, Painting;
Shipment: Express, by Air, by Sea;
Machining Process: CNC Milling, CNC Lathe;
Delivery Time: Within 10days;
Tolerance: +/-0.005;
Quality Control: 100% Inspect Before Shipment;
Trade Methods: EXW, Fob, CNF, DDP, DDU;
|
Condition: New;
Standard: DIN, ASTM, GOST, GB, JIS, ANSI, BS;
Customized: Customized;
Material: Metal;
Application: Metal Processing Machinery Parts;
Steel Alloy Machining Part: Tolerance:0.01mm;
|
After-sales Service: Yes;
Warranty: Yes;
Condition: New;
Standard: DIN, ASTM, GOST, GB, ANSI;
Customized: Customized;
Material: Aluminum;
Application: Machines and General Industry;
Process: Milling, Turning;
Heat Treatment: N/a;
Surface Treatment: Anodizing;
MOQ: 1PC;
Sample Lead Time: 2 Weeks;
Mass Production: 2-4 Weeks;
Shipping: Air, Sea, Rail, Express;
Terms: Fob China Port;
Payment: Negotiable;
|
Condition: New;
Standard: DIN, ASTM, GOST, GB, ANSI;
Customized: Customized;
Material: Metal;
Application: Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery;
Process: Milling, Turning, Polishing;
Heat Treatment: N/a;
Surface Treatment: N/a;
MOQ: 1PC;
Sample Lead Time: 2 Weeks;
Mass Production: 2-4 Weeks;
Shipping: Air, Sea, Rail, Express;
Terms: Fob China Port;
Payment: Negotiable;
|
Condition: New;
Standard: DIN, ASTM, GOST, GB, ANSI;
Customized: Customized;
Material: Metal;
Application: Metal Recycling Machine, Metal Cutting Machine, Metal Straightening Machinery, Metal Spinning Machinery, Metal Processing Machinery Parts, Metal forging Machinery, Metal Engraving Machinery, Metal Drawing Machinery, Metal Coating Machinery, Metal Casting Machinery;
Process: Milling, Turning;
Heat Treatment: N/a;
Surface Treatment: Oxidized;
MOQ: 1PC;
Sample Lead Time: 2 Weeks;
Mass Production: 2-4 Weeks;
Shipping: Air, Sea, Rail, Express;
Terms: Fob China Port;
Payment: Negotiable;
|