Copper Aluminum Single Bolt Parallel Groove Pg Clamp

About this Item
Details
Company Profile

Price

Min. Order Reference FOB Price

100 Pieces US$1.00-2.00 / Piece

Sepcifications

  • Technics Processing
  • Standard IEC 61284-1997
  • Usage Substation Fittings, Line Fittings
  • Type Splicing Fittings
  • Transport Package Exporting Carton
  • Specification Al & Cu
  • Trademark Da Sheng
  • Origin Yangzhou City, China
  • Material Aluminium & Copper
  • ODM OEM Accept
  • Bolts Not Less Than 6.8 Grade
  • Samples Free
  • Surface Smooth
  • Warranty 12 Months
  • Application Overhead Line

Product Description

Copper Aluminum Single Bolt Parallel Groove PG Clamp Description: Parallel groove clamp is an essential component of overhead transmission lines. It is designed to effectively join the conductors in an overhead line in a secure way. This clamp is generally made up of a body, two bolts, and two ...

Learn More

Pg Clamp Comparison
Transaction Info
Price US $ 1.00-2.00/ Piece US $ 1.20-1.50/ Piece US $ 1.20-1.50/ Piece US $ 1.20-1.50/ Piece US $ 0.35-0.55/ Piece
Min Order 100 Pieces 100 Pieces 100 Pieces 100 Pieces 100 Pieces
Trade Terms - - - - -
Payment Terms L/C, T/T, D/P, Western Union, Paypal L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram L/C, T/T, Western Union, Paypal, Money Gram L/C, T/T, D/P, Western Union, Paypal, Money Gram
Quality Control
Management System Certification ISO 9001, ISO 14001, OHSAS/ OHSMS 18001 ISO 9001 ISO 9001 ISO 9001 ISO 9001
Trade Capacity
Export Markets Europe, Southeast Asia/ Mideast, East Asia(Japan/ South Korea) North America, Europe, Africa North America, Europe, Africa North America, Europe, Africa North America, Europe, Africa
Annual Export Revenue - - - - -
Business Model OEM, ODM OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand OEM, ODM, Own Brand
Average Lead Time Off-season: 1 Month(s)
Peak-season: 1-3 Month(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Off-season: within 15 Day(s)
Peak-season: within 15 Day(s)
Product Attributes
Specification
Technics: Processing;
Standard: IEC 61284-1997;
Usage: Substation Fittings, Line Fittings;
Type: Splicing Fittings;
Material: Aluminium & Copper;
ODM OEM: Accept;
Bolts: Not Less Than 6.8 Grade;
Samples: Free;
Surface: Smooth;
Warranty: 12 Months;
Application: Overhead Line;
Technics: Injection Molding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Tension Clamp;
Bolt: 1 Bolt;
Technics: Injection Molding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Suspension Clamps;
Bolt: 1 Bolt;
Technics: Injection Molding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Suspension Clamps;
Bolt: 1;
Technics: Injection Molding;
Standard: GB;
Usage: Substation Fittings, Line Fittings;
Type: Terminal Clamp;
Finish: Acid Cleaning;
Supplier Name

Jiangsu Chuandu Electrical Technology Co., Ltd.

China Supplier - Gold Member Audited Supplier

ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.

China Supplier - Diamond Member Audited Supplier

ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.

China Supplier - Diamond Member Audited Supplier

ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.

China Supplier - Diamond Member Audited Supplier

ZHEJIANG SMICO ELECTRIC POWER EQUIPMENT CO., LTD.

China Supplier - Diamond Member Audited Supplier